Log InSign Up

Calvin Cheung: in Hong Kong, HK

Calvin Cheung

Hong Kong | HK
Skills

No information

Interests
Diy
Handmade leather
Industries
Tech
HomeSummaryActivityProjectsWork experienceEducation historyConnectionsCompanies
Summary
Activity
Projects

No information

Work experience
Image LEOCO (HK) Ltd

LEOCO (HK) Ltd

VP of engineering | 08/2016 - 11/2019

Company nature : Industrial & medical cable and harness assembly manufacturer. ODM and EMS service for outdoor waterproof lighting product. Achievement : Year 2019 : Be core committee of ISO13485 system certification application , cert. will release at Dec Implement lead six sigma concept into production line after training,improve 10% of production efficiency Year 2018 Developed and drive production team to use cell line formatted to fit high mix low volume business model at 2018. Increase production efficiency 8.5% on one part number. Organized and implement manufacturing execution system and root cause analysis system at 2018 Dec. Shorten 8D report within 3days feedback to customer. Year 2017 Establish NPI team and process mapping in order to improve manufacturing transition from sample stage to mass production stage. Improve the production first launch product successful process yield from 75% to 95%. Establish SMT production line stretch from zero. Save SMT outsourcing service cost 150K HKD per month. Duty: Restructure engineering team into R&D, manufacturing engineering, NPI team, tool shop and automation team with department goal and KPI in order to meet company goal. Design and implement company technology roadmap and budget planning Implement lean manufacturing for high mix low volume product. Design plant layout and machine mapping to serve process control purpose.
Image Matsunichi digital technology (Hong Kong) Limited

Matsunichi digital technology (Hong Kong) Limited

Director - Quality | 06/2015 - 06/2016

• Combine quality system ISO9001, OHSAS18000 and ISO14000 into TUV • Rebuild the quality team on company downsize •Setup NPI quality reporting system to difference customer
Image Matsunichi digital technology (Hong Kong) Limited

Matsunichi digital technology (Hong Kong) Limited

Director - Manufacturing Solution | 03/2013 - 06/2015

• Setup NPI team in 3 month with 30 engineers, 600 workers, 3 SMT lines and 10 individual production floor. • Provide DFM, DFT to customer at earlier stage. Shorten customer development cycle time over 1 month.
Image Matsunichi digital technology (Hong Kong) Limited

Matsunichi digital technology (Hong Kong) Limited

Senior manager | 03/2012 - 03/2013

Design our own luxury brand "Le Pan mobile" for specific VIP customer in half year and successful launch on Tianjin golden metropolitan club champion cup.
Image Giant Electronics Ltd

Giant Electronics Ltd

Senior mechanical engineering manager | 07/2008 - 03/2012

Company nature: OEM & ODM manufacture of wide range of RF electronics and waterproof handheld product, such as Motorola two way radio, DECT phone, VoIP phone & mobile. Duty: • Respond for all range of product mechanical design, costing control and schedule delivery to the end of customer. • Manage outsource design house deliverable up to company standard. • Manage outsource of plastic & metal tooling supplier deliverable up to company standard.
Image Automatic Manufacturing Limited

Automatic Manufacturing Limited

Senior manager | 05/2007 - 07/2008

OEM & ODM manufacture of medical, electronic, telecom & office equipment, home automation & Industrial control equipment. Duty: • Respond design new needle punching mechanism of glucose meter for Agamatrix. • Handle daily operation of 20 peoples of engineering team which include mechanical, electronic & PIE. • As a consultant of GSM + GPS OEM project. • Participant in design assurance team to review OEM project. Prepare DFM report feedback to customer oversea R&D team to ensure the design can be implement in factory. • Prepare PFMEA at NPI stage until mass production.
Image WE3 Technology Company Limited

WE3 Technology Company Limited

Mechanical engineering manager | 11/2005 - 05/2007

Company nature: Startup company focus on customize mobile phone platform solution to customer. Duty: • Communicate and support our customer on mechanical, acoustic and ID design. • Feasibility studies the industrial ID and mechanical manufacturability with customer. • Process mapping with customer detail schedule • Prepare the mechanical specification • Prepare DFMEA • Department goal setting and annual budget planning.
Image Radius Hong Kong

Radius Hong Kong

Senior engineer, Mechanical | 12/2002 - 11/2005

Company nature: Provide contract product development service for NOKIA mobile, PDA and consumer electronics to customer. Duty: • Mechanical mobile phone design with Pro-engineer, I-Deas & CATIA software. • Feasibility studies the industrial ID and mechanical manufacturability. • Prepare the mechanical specification • Prepare 1D tolerance analysis in both worst case and statistical. Define the critical dimension after tolerance analysis. • Prepare DFMEA and action followed. • Working with production engineer for plastic part 2nd process, such as ultrasonic welding, spray painting, pad painting & heat staking. • Study Cpk & GR&R report for pre-production phase. • Study short-term SPC data on pre-production phase.
Image Philips Consumer Electronics

Philips Consumer Electronics

Senior Engineer (Mechanical) | 08/2000 - 11/2002

Company nature: Portable Audio manufacturer Duty: • Respond for mechanical design of Nike+Philips MP3 sport audio product • Co-operation with packaging expertise for product packaging
Image VTECH Electronic LTD

VTECH Electronic LTD

Mechanical Engineer II | 03/1993 - 06/2000

Company nature: Toys & electronics products manufacturer Duty: Detail designs of personal organizer and produce engineering drawing for mould making. Trouble shooting and report to senior mechanical engineer. Mechanical Engineer II Mechanical Engineer I (Promote at Sept. 1995) Senior mechanical engineer(Promote at October 1997) Respond to toys division mechanical design, project following-up and lead a group of engineer in DG factory. Respond a costing control, schedule control, and prelim mechanical design on pre-development state. Prepare the skeleton model by pro-engineer and negotiate product ID with industrial designer.
Education history
Image City university of Hong Kong

City university of Hong Kong

Master degree | 2002 - 2006

Image City university of Hong Kong

City university of Hong Kong

Degree

Connections
Companies (0)

No information

1501 Lincoln Blvd.#1014 Venice, CA. 90291