EZ

Ekram Zaman

GM QUALITY & PRODUCTION · LANTABUR GROUP - MAONA SREEPUR

Dhk, 13

In My Own Words

A highly experienced member of Manufacturing and Sourcing with experience ranging from Product Development, Production Management, Industrial Engineering, Quality Management roles through to General Plant Management, DO ;Executive status as Chief Representative. Sourcing, Plant startup, Manufacturing and planning strategies, QA and QC as well as strategic out-sourcing and controlling of both internal and external loading have been a large part of my roles.
Working for more than 27 years, progressively in Senior management roles in challenging environments have added immensely and effectively to the scope of my organizational and communication skills. In companies with global footprint, including many cultures, the ability to build, motivate, promote, coach and lead professionals and those around you into an effective cross functional team is indispensable. Embrace diverse environments, promoting creativity and teamwork, effective problem solving with breakthrough results.

Work Experience

GM QUALITY & PRODUCTION

LANTABUR GROUP - MAONA SREEPUR

2017 – Present

In the capacity as the GENERAL MANAGER I am leading the plant network of 3 manufacturing factories with a total of $ 90 Mil min, one of the recognized companies in Maona, Sreepur. A true Fast Fashion Company, delivering 90000 T-shirts per day. The main objective is to develop the existing processes to more effective and modern industrial standards, while cutting out waste and bringing innovation and speed. This project has seen a multi-million dollar savings opportunity.

Q A MANAGER

LI & FUNG BD LTD DHAKA

2005 – 2016

As a QA Manager of Li & Fung BD Ltd Buying operation, I am leading an organization of 3 Asst QA Managers, 36 Senior QA's/QC's, 1 Compliance Officer, one and Lab Technician. Reporting to the Quality Director at headquarter in Hamburg, Germany. Responsible for translating and implementing German standards into Bangladesh's production is one of the main objectives in order to meet the required shipment standards. Supervising the third-party manufacturing process of 40-60 factories and evaluating the manufacturing plants compliance to the agreed Code of Conduct / BSCI / SA8000. Total Turnover by US$ 100 Mil.

ACHIENVEMENT: ? Updated and re-implemented the QC manual, inspection process review, inspection process training and a restructuring exercise has been vital, bringing the department up to the required speed.An inspection booking procedure and an optimized staff plan have been implemented. ? A comprehensive cross training and the right first time principle has improved the capability of QAs and improved the successful startup of manufacturing process. ? The strategy production safe improved the product development, incorporating the capability of the supplier for a more successful manufacturing process. Systematical follow up of all sample processes, punctual lab testing, daily production output check. Prepare, teach and train factories to perform in quality and compliance audits successfully. ? Strategic factory souring when additional capacity is swiftly needed, as well Source grading were included in my duties. I introduced and developed a thorough statistical report to streamline and further optimize the division and the belonging budgets.

Main products: Men's and ladies woven of all kinds incl. jeans, men's formal shirts, Flat knits/ Knits fully fashioned and knits cut and sewn / circular knits for the German and English market. The key customers are Aldi, Lidl, TCM, Tesco, Katag, Takko, C&A, Telecom, Dunnes, BHS and Debenhams.

QUALITY ASSURANCE MANAGER

LANNEYFASHIONS LTD DHAKAEPZ

2000 – 2005

AS a Q A Manager, reporting directly to the CEO.The given task is to evaluate and increase the efficiency as a manufacturing development for the largest garment manufacturer with 3 production floor, while managing the plant of 2800 employees. Control and evaluation of the organization including its capacity and budgets as well as handling customer visits are also very essential. The main products we manufactured have been woven coats, long pant, shorts and jackets, as well as coordinates, trousers and skirts. The key customers are Gap,Levis, Max,Marks & Spencer, Hugo Boss, Macy's USA, Next Signature, Reggie.

ACHIEVEMENTS: ? As my first priority with a clear mandate from management towards cost control and optimization to ensure the viabilityof the company, manpower was reduced by 6% by the implementation of a centralized cutting center. This was achieved by integrating the cutting room of subsidiary's manufacturing place into the headquarters' cutting operation with auto cutter and eliminating hand cutting, while raising the quality and accuracy at the same time. ? Merged the production preparationsection with the garment development department. Labor has been lessened by 5%, while required sample capacity increased by 7% when sharing main functions. ? Development of QC organization and their report systems.Reduced the manpower requirements by 10%. Organizing AQL 1.0 checks in small lots, line by line daily, to eliminate rejections by customers' QC's. This improved the quality standard drastically and secured shipments on time with the required quality standard. ? Due to bundle size reduction, control of interval and a more strategic approach of line planning we were able to load the production lines with 10% more work after only 3 months. ? The straight on-line system has been changed to a combination of lining team, preparation team, pre- assembly, main assembly and final centralized ironing team, enabling elimination of unproductive days, earlier output by two to three weeks and maximizing efficiency by 6%, while reducing the production overhead by 12%.

QA MANAGER TO ASST MERCHANDISING MANAGER

Nike,Osh Cosh

1996 – 1999

As a QAM It is to manage all aspects of the business from the day-to-day activities to planning the next stage of development & sourcing for this powerful manufacturing units. The main products that we produced through supplier are Knits cut and sewn, woven sportswear with prints and embroidery often garment processed. The main customers are CV, Puma, Adidas, Nike,Osh Cosh, Champion,

ACHIEVEMENTS: ? Introduced amore product-based factory and supplier loading plan system and skill matrix to increase productivity and to ensure shipment dates are met, via report feedback to a central tracking base. Developed and fine-tuned the tracking system also for the supplier base for accurate detailed data, enable to develop sections more transparent to be able to control punctually deliveries. ? Set up new quality awareness system throughout the factory The external QA team for the supplier base has been strategically optimized on headcount and function. ? Introduced a sequential flow production and shorter sewing lines for lower quantities for quick response orders for 3 different customers. ? daily factory and supplier performance in terms of efficiency and quality with more accurate reporting structure and accountability. ? Introduced product specific testing and planning for comprehensive garment processing procedures, upon drafting out an individual critical path working with the designers on the garment development for unusual garment processed items to be able to drive them successful production safe in the production process and secure their quality standard and deliveries at the suppliers and in-house.

PRODUCTION MANAGER

PROFECY GMTS LTD

1993 – 1995

Organizing and managing Factory in Dhaka with 600 employees including external cutting department at bonded warehouse. Control of all systems and procedures to improve productivity and efficiency. Sourcing of sub-contractual factories. Main products were T shirt, Polo Shirt, Sweat shirt, Tank top, Pajama Sets & Shorts mainly for the German market.Monitoring and control of punctual order execution meeting the appointed quality requirements.

ACHIEVEMENTS: ? Changed the 6 production lines into a two shift operation, with new advanced more cost-effective methods, on a Group Incentive based system. ? Introducing correct planning, production control monitoring system and quality monitoring control at various points of the production process to ensure maximum problem solving at source without letting the problem move, until a solution was found. Output increased by 15% within 7 months. ? Introducing out sourcing to many new sub contractual plants by viewing and evaluating their facilities and capability. Advising on capacity and quality standards; able to achieve lower target prices. ? Supervising the entire QA and QC team for 15 Suppliers, additional Subcontractors and the own Production.

Exam Title Concentration/Major Institute Result Pas.Year Duration Achievement

Industries

Fashion