George DIAO
China Construction Director · Sportmaster
Work Experience
China Construction Director
Sportmaster2013 – Present
Report to China GM/Global development director/Global maintenance director Responsibility • Achieve company new store development target, from construction point of view; • Fully responsible for all aspects of project execution from site feasibility and evaluation through construction completion and handover; delivering newly constructed /decorated stores (from lease negotiation, concept and construction drawing design, construction management, administration permission, commissioning, final acceptance) to business operation team; • Responsible for project design, cooperation with HQ architect and zoning plan department for project design; • Responsible for project schedule, set up project schedule and control all parties strictly follow it; • Responsible for quality of construction works, ensure all work strictly follow company standard; • Responsible for CAPEX budget, achieve higher construction quality with reasonable lower cost; • Take lead the project coordination internal and external to ensure store opening; • Responsible for authority application and approval for store opening; • Responsible for bidding and procurement of construction and maintenance work, trade equipment etc; • Identify potential risks and develop action plans to control or minimize the risk; • Establish and maintain highly effective and competitive contractors and venders to meet company's ever-changing business needs; • Adapt and develop standard project procedures; • Responsible for the store safety, design and install store safety system, ensure the store fulfil HQ safety regulation; • Responsible for the store maintenance, ensure store operation under the clean, comfortable while safe condition; Achievement 2 • Opened 24 stores in China, totally around 38,000m in 12 cities. All the stores were finished with high quality, limited budget and within timeline; • Adapted and localized technical specification of Sportmaster stores in China; • Set up standard procedure and control document for the new store opening and store maintenance; • Set up procurement procedure and document for the construction and maintenance procurement; • Set up a small while productive department to meet with company's development; • Design and open the 1st new format store in China.
manager
TRAFIGURA2012 – 2013
Report to Impala Managing Director /Global Construction director Responsibility Prepare concept design and roughly budget for the new project feasibility evaluation; Fully responsible for new projects, from land purchase technical negotiation/Administration permission, Concept and construction design, CAPEX Budget, Bidding and procurement, Construction management, Schedule, Commissioning and Handover etc; Manage general contractors, venders, design company, project management company and all other parties of project to achieve target quality, schedule and budget; Achievement FANGCHENG warehouse project; (1 covered steel warehouse 13,200m2, 1 office building and 1 lab, 1 open yard around 31,000m2); YANGSHAN warehouse project. (1 covered RC 2F warehouse around 20,000m2 and 1 smaller office building, 500m2).
China Project Head
DECATHLON2010 – 2012
Report to China expansion director/Global Construction director Responsibility Responsible for all aspects of project execution from site feasibility evaluation to construction completion and handover to business operation team (from land purchase process, lease negotiation, procurement, permission and license, construction management, commissioning, final acceptance of construction and warranty); Budget control to achieve higher construction quality within reasonable lower cost; Check the potential site and give technical evaluation, draft technical interface handover conditional; Sustainable technology/material/equipment analysis and test in new store; Achievement Opened 20 new stores and extended 2 more stores in 16 cities (total construction area 102,000m2); Built the 1st store in Taiwan, the total area of this store is 20,000m2, 4 floors; Supervised the leased Beijing warehouse to strictly follow Decathlon's technical requirement; Set up 4 regions (East, West, South include Hong Kong and Taiwan) for Construction department, altogether recruited and trained 8 project managers; Optimized the technical specification of Decathlon store in China; Maintained reliable, effective and competitive suppliers in different region to meet Decathlon's fast development.
Project Manager
DECATHLON2008 – 2010
Report to China construction director Responsibility Responsible for purchase land projects, from project plan to design, budget control, bidding, construction, to final acceptance; Responsible for administration permission from project setting-up to obtain property license; Achievement Huaqiao Warehouse project with NFPA standard. (1 covered steel warehouse with 6 cell 36,900m2, 1 office building and technical room, 3534.7m2);
Site CSA Engineer
DECATHLON2006 – 2008
Responsibility Design control, ensure design meet with the technical requirement of client, cooperate with client, design company and subcontractors for design change issue; Bidding, draft bidding document, organization bidding and prepare tender evaluation report; Contract negotiation and management ; Site manage sub-contractors' work, progress, quality assurance, safety, cost etc; Cost control to sub-contractor's work; Coordinate the relationship with Owner's representative, make the action plan for the owner's instructions Draft and compile the maintenance documents and train the clients' maintenance staff; Achievement
Education
Master Degree
TONGJI UNIVERSITY2003 – 2006
Master Degree
Bachelor Degree
Zhengzhou UNIVERSITY1998 – 2002
Bachelor Degree