Mauri Jimenez
Lead design and implementation · Tijuana
Work Experience
Lead design and implementation
Tijuana2019 – 2021
July 2019 - October 2021 by establishing clear objectives and project timelines reducing opportunities for delays and mistakes, ensuring customer satisfaction and project profitability.
? Lead design and implementation of a complete business unit including the purchase of 7 CNC machines, several custom-made assembly solutions and facilities improvements. Managing first order production, PPAP submission and ensuring lean manufacturing practices.
? Demonstrated ability to innovate through creation of two products which were submitted for patent and granted internal intellectual property certificates with patent in process.
? Introduced 3D printed components to mil-qualified production lines as an additional Aptiv, Formerly Delphi catalog offering, reducing cost to manufacture, part price and lead time.
Sr. Product Design Engineer ? Developed best practices and knowledge database to standardize 3D modeling and Finite Element Analysis to improve document modification, consultation and eliminate CAD
Production Supervisor
Tecate2015 – 2017
June 2015 - August 2017 ? Mentored the rest of the team in R&D activities and best practices to achieve consistent quality of work, successfully improving the reputation and confidence in the department.
? As Production Supervisor, decreased personnel rotation under 2% and maintained over 120 staff members during the entire project. Increased overall production output by 20% or more by tracking and minimizing most significant downtimes and ensuring takt time was met.
? As Production Control and Inventory Analyst, reduced lead time for most products for contactor and lever switch product lines by reducing inventory for parts with more than 30% excess, obsoletes and using available space to increase sub-assembly stock. Rockwell Automation ? As Manufacturing Engineer, implemented electronically controlled tooling to Leadership Development Engineer programmatically determine torque for all screws and bolts applied to each produced unit,
Quality Engineer
Tecate2012 – 2015
January 2012 - June 2015 eliminating risk for operator error, and thus considerably reducing inspection times. Also documented improved processes by developing missing and updating existing FMEAs and control plans.
? As Quality Engineer, implemented the use of electronic torque verification tools that logged each reading, simplifying the inspection process and allowing inspectors to focus on the most common false acceptances and customer complaint root cause defects
? Developed a modular compression mold design that eliminated the need to fabricate low wear areas of the plates, significantly reducing fabrication time and diminishing raw material cost by up to $1M USD per year. Parker Hannifin ? Consistently delivered mold designs, Poka-yoke Jigs/Fixtures and tooling used in Manufacturing Engineer production for rubber molding. Created and maintained BOMs and routing sheets.