Paneendra Rameshbabu

Paneendra Rameshbabu

Process Improvement Intern · Yanfeng Automotive Interiors, MI

Memphis, Tennessee

In My Own Words

Seasoned Industrial Engineer with over 9 years of experience driving impactful warehouse automation, supply chain optimization, and large-scale manufacturing projects. I specialize in leading high-stakes initiatives, including a $15M automation rollout and integrating Manhattan Active (WMS) with Matthews (WCS) to streamline data flow and real-time productivity tracking.

By merging Lean Six Sigma methodologies with data-informed strategies, I have a verifiable history of exceeding performance goals, increasing storage capacity by 17%, and securing cost-saving vendor contracts. I am adept at managing all facets of new program launches and coordinating cross-functional teams to achieve maximum operational output with minimal resource expenditure.

Core Expertise: Warehouse Automation, WMS Implementation, Process Engineering, Workflow Optimization, Risk Mitigation, and Power BI Analytics.

Work Experience

Process Improvement Intern

Yanfeng Automotive Interiors, MI

2017 – 2017

? Line balancing for headcount reduction that resulted in savings of $120,000 annually ? Performed time study using Yamazumi chart to identify non-value added and waste activities ? Designed layout using AutoCAD for the assembly line and production area to reduce material flow distance

? Moved trim operation to level workload that resulted in throughput increase by 7,620 units ? Performed motion study using MODAPTS codes to calculate number of operators required on a production line ? Created balanced work standards using MODAPTS code for a launch project ? Redesigned workstation to reduce 90% of scrap occurred by dents which resulted in savings of $10,000 ? Worked with a collaborative robot to automate trim operation using a sonic knife

Junior Operations Engineer at PRK Multi Components

How-How

2013 – 2015

Jul 2013 - Jul 2015 ? Lean maturity project to ramp up throughput ? Conducted time study on 25 machines to analyze capacity and identified bottleneck machine through Takt time chart ? Performed 8D analysis on bottleneck machine which improved overall equipment effectiveness by 11% ? Introduced hourly monitoring sheet to capture scrap and rework ? Installed supermarkets with minimum inventory on bottleneck machine for smooth flow of product ? Conducted red tag events to implement Total Preventive Maintenance (TPM) ? Calculated Mean Time Between Failures (MTBF) and Mean Time to Repair (MTTR) for preventive maintenance. ? Designed poka-yoke to reduce rework and scrap which resulted in savings of $1500/month ? Collected random samples through process monitor sheet to calculate process (Cpk) and product capabilities (Cp)

Education

Master of Science in Industrial and Systems Engineering

Northern Illinois University

2017

Master of Science in Industrial and Systems Engineering

Bachelor of Engineering in Mechanical Engineering

Visveswaraya Technological University

2014

Bachelor of Engineering in Mechanical Engineering