SR

Steven Ryan

Production Control / Processing Manager · W International

Mount Pleasant, SC

Work Experience

Production Control / Processing Manager

W International

2020 – Present

• Reports directly to the Director of Operations. • Oversees: Material Processing, Machining, Blast-Paint, and Document Control Technicians • Ensure timely scheduling of work to the shop floor. Includes, identifying project location, start dates, completion of traveler books, material processing and staging, and Superintendent and Supervisor assignment. • Provide/Generate a high level Milestone Schedule (Fishbone) for every project on the shop floor - review Milestone Schedule during the Manufacturing Kickoff and post at each project work cell - review and update weekly. Maintain updates to the schedule through Project completion. • Schedule and Facilitate the Project Manufacturing Kickoffs with the appropriate Production Superintendent, Project Manager, Weld Supervisor, Quality, and support personnel In Accordance With (IAW) Manufacturing Kickoff Checklist. • Establish and Facilitate the Daily Production Meeting to review current Projects on the shop floor and support required for the day to execute the schedule. (Minimum Required Attendees: Production Superintendents, Project Management, Quality Control, Lifting and Handling, Blast-Paint, Procurement, Logistics) • Collect Welder/Fitter Performance Data weekly. Schedule a weekly review and coordinate with Production Superintendents to take appropriate actions resultant of the review. • Review Production Floor Project Layout and future Work to establish the location of the Work Cell Layout for each Project - consideration to include Work Flow, Build Plan, Project Size, Number of Personnel assigned, Consumables, and Cleanliness Requirements. • Spearhead the scheduling of ALL projects to the shop floor. Ensure Projects are manned and space is allocated as required to execute the current work. • Coordinate with Engineering and Quality Assurance to deliver job traveler books to the shop floor in a "timely" manner. Establish a means to track the "required by" date for each project to enable the Document Control Technician's to drive. • Ensure Welder Qualification Matrix is updated and maintained weekly. Coordinate with Weld Training, Weld Engineering, and Document Control to ensure they are all aligned. Perform periodic audits of the process to verify accuracy. • Provide specific direction to the Document Control Technicians for Processed Work and Project Work record retention requirements. Implement an audit program to periodically provide feedback to the

internal processes. Track results of the audits and implement initiatives to improve the processes via a POA and M. • Schedule and coordinate monthly strategic scheduling meetings with Project Managers to review current backlog and a 6 month look ahead of ALL jobs "Under Contract" • Act as Primary liaison with Production Superintendents, Lifting and Handling Manager, MP and L Supervisor, and Director of Supply Chain for deliverables via truck or barge shipments. • Schedule periodic review of Projects with PM's and Production Superintendents (align on Deliverables, Schedule, Shipments, and Paint Schedule requirements) • Facilitate weekly Overtime submission to the Director of Operations - include all Production Support required (Production, Logistics, Material Handling, Quality, Lifting and Handling, and Facilities personnel) • Oversee the weekly updates of the Personnel Board, Job Location Tracker, and Manufacturing Kickoff Schedule. Provide weekly updates to the Director of Operations. • Serve as a role model on the shop floor with respect to the company values, vision and mission. Ensure clear alignment with the company's direction. • Liaison with Human Resources in ALL personnel matters under your cognizance. • Additional Duties as assigned by the Director of Operations.