• Textile Engineering Professional with 6+ years of experience in Industrial Engineering, Production Planning Management, factory management, in Apparel manufacturing Industries.

Work Experience

Handling Buyer

Manpower

2019 – 2020

• Expertise in Productivity Improvement using Industrial Engineering, Handful experience in Capacity planning, Layout planning, Manpower planning and Internal Logistic planning. • Organization: Jerash Garments Pvt Ltd. Jordan Position: PLANNING &SENIOR IE (Outer wear Jackets - Woven products) Period: (2019 JAN-2020 DEC) Details of Responsibilities

• Handling of 5 Buyers Accounts in Outerwear Jackets/Polo T-shirt, bottom Products both Woven and Knits Handling with 650 machines in Sewing, handling Include Cutting, Bonding, and embroidery Finishing, R&D and Sample development. • Handling Buyer such as The North Face, Columbia, Walmart, Pebble Beach, Fruit of the Loom, Eddie Bauer, and Tommy. • Developed factory Capacity from 55% to 65% Avg Efficiency. • Reduced Man to Machine Ratio in 1 year period (From 2.22 to 2.06) by analyzing the proper Capacity and utilization of man and machines in each departmentwithallocated fixed budget and plan to reduce it to 1:95 as upcoming yearly Target (factory target is 1:9) • Deep focus on Pre planning activity (For Styles Line Fixing, Style change reduce, advance Plan for cutting, Machine/Folders, Manpower Plan and fixation) to meet delivery with planned efficiency. • Responsible for Trims Consumption and follow up. • Thoroughly work on OB with SMV data accuracy to save the Costing and make order execution in the CM. • Implementing new methods in advance for cost savings in (Man, Folder, Machines and Training). • Deep focus on Daily department wise production (Cutting/bonding/embroidery Sewing/Finishing) to achieve the efficiency based on budgeted plan efficiency to the factory. • Coordinating with Planning Dept. to make weekly and monthly planning based on capacity and delivery plan.

Implementation • Implemented online packing. • Skill matrix for each line operators and displayed in front of lines, it's used to place operators according to their skill level it helps to reduce the learning curve. • Implement group incentive scheme to sewing, cutting and finishing to improve productivity based on allocated budget. • Process fix up in Cutting, bonding, Sewing and finishing. • Started a local training (Jordanians) line to make the Operator back up to cover in Monthly turnover. • Reduced absenteeism from 10 % to 5% by motivating the employees through attendance bonus scheme. • Implemented supervisor bonus scheme. • Implemented best line reward. • Cost Saving and Operation Elimination has done Styles and also improve the line efficiency and productivity. • Trimming Helper Eliminated from all Lines and make Operator Self trimming activity and keep monitoring to maintaining same efficiency and productivity. • Implemented KANBAN for Input and accessories arrangement. Reports and Monitoring • Authorized Costing approval to the Merchandiser for the CM execution, Based on OB fixation and line target achievement based on line cost and Factory budget. • Thread consumption Approval. • Pre plan on Styles, Delivery, Machines, Man power, Hourly Report and Day Reports. • Loss time Monitoring and Updating towards the Minutes and Cost value. • Style change over time report. • Department wise daily Plan and Actual report circulation with efficiency. • Machine contribution report. • Daily factory WIP report. • Daily revenue report. Reporting to: IE Manager and GM on daily basis.

Senior industrial Engineer

SAN international Gurgaon, India

2018 – 2018

industrial Engineer

Gokaldas export

2015 – 2017

Details of Responsibilities • Planning Loading as per deliveries as per color wise &qtys. • Following with Size set. • Fabric & Trims follow ups. • Responsible for Trims Consumption and follow up. • To understand the constructions during sample making and work on possible simplification of construction. • To finalize on method, machine layouts, operators & helpers for each operation etc., in other words, to keep complete batch setting ready on paper. • To prepare thread consumption worksheets before PPM. • To set each process as per the planned method. • Understanding Static & Dynamic Bottlenecks and addressing with action plans (Floaters and Jumpers). • Classification of factories with low, medium and high productivity for monthly wise. • Work study for all tasks. • Hourly production data collection and solve the low productivity task and balancing the low productivity task. • To implementation of Lean concepts. • 1st target achievement plan. • Eliminating 07 wastes in the system. • To compare the actual time values with SMV. • To make production and efficiency reports for daily wise. • To control the MMR of factory. • Set up the operator selection and training procedures. • Training for supervisors and motivation to improve productivity.

Reports: • Daily Forecast Report of Plan VS Actual and factory Efficiency. • Daily revenue report • Daily Incentives preparation based on allocated budget. • Weekly Plan review meeting and reports based on Delivery. • Weekly Style review meeting with OB and SMV. • Machine Plan preparation. • Hourly Report Monitoring and circulation. Report to IE Manager& Factory manager on Daily Basis.