In My Own Words
I have a BS in Mechanical Engineering from California State University Long Beach and have my Project Management Professional certification.
I can be reached at dgduff777@gmail.com
Work Experience
Acrylic General Manager
Advancced Aquarium Technologies2013 – 2014
• Managed all activities regarding acrylic production in the Guangzhou, China factory. Directed designers and draftsmen using Revit and AutoCAD to generate product drawings, coordinate product installations, plan factory layouts, and design tooling. • Established schedules and managed project budgets (up to $2,000,000) for factory and site work. • Supervised fiberglass factory of 60+ employees. • Wrote procedures and developed production techniques, increasing quality and safety standards. • Set quality and testing protocols. • Designed tooling and fixtures for material handling, testing and fabrication. • Conducted structural analysis of steel, fiberglass, and acrylic.
Vice President Technical Development
Reynolds Polymer Technology, Inc.2007 – 2013
• Assessed manufacturing and fabrication techniques. Directed implementation of production and test procedures to improve speed, safety, and quality. • Coordinated acquisition and training of tensile testing (Instron 1124 universal tester) and color testing (HunterLab Ultrascan VIS spectrophotometer) equipment. • Managed multiple projects between $1,000,000 and $6,000,000 running concurrently, overseas and domestic. Assembled and supervised crews of up to 20 people per project along with the work of subcontractors and vendors. Designed custom tooling and fixtures to bond, fabricate, and move acrylic panels. Accountable for processes, quality, testing, schedule, and budget. • Responsible for new product Research and Development from concept through actualization. o Developed R-Cast® Palette® and Mirage® from concept to production in 8 months (www.reynoldspolymer.com/r-cast-palette and www.reynoldspolymer.com/r-cast-mirage) o Set quality standards along with testing and inspection procedures. o Led team to design and specify process equipment including jigs and fixtures, material handling equipment, vacuum tables, hydraulic presses, and process ovens. • Represented company with customers to provide technical education and support of products while gaining a thorough understanding of the customer needs.
Vice President Engineering
Reynolds Polymer Technology, Inc.1989 – 2007
• Established industry standards, specifications, and testing requirements for product quality and use, both at a corporate level and at a national standards level through ASME. • Supervised Quality Assurance/Quality Control department of 6 inspectors. Directed and coordinated QA/QC activity including developing a quality assessment program and material testing program incorporating data gathering and analysis to improve quality. • Authored over 50 manufacturing, quality, and testing procedures. • Managed engineering department of 10 engineers and designers. Set corporate engineering standards, ensuring consistency with company mission statement and core values. Program packages implemented - AutoCAD, SOLIDWORKS, ANSYS, Femap with Nastran, Primavera Sure Trak, Microsoft Project, MS Office products. • Oversaw design and commissioning of two acrylic manufacturing plants. A 75,000 sq. ft. domestic facility from the ground up and a 43,700 sq. ft. Thailand building conversion. o Responsible for specification, design review, procurement, and installation of casting systems, including reactors, autoclaves and associated equipment (boilers, cooling towers, pumps, valves, etc.). • Provided process improvements to efficiencies, safety, and ergonomics through tooling and equipment design changes. Increased casting capabilities 50% and casting size 300% by optimizing tooling for existing equipment. Oversee procurement and/or manufacturing of such tooling. Improved casting proficiencies from 65% to 99% success rate. • Responsible for hiring, performance reviews, mentoring, and disciplinary action under the engineering umbrella of supervision (engineers, QC personnel, and laboratory personnel). • Directed laboratory including Research and Development. Oversight for chemical procurement, chemical disposal, and associated handling and safety procedures. Managed scale up of processes from workbench to factory floor. • Supported and/or directed Installation Manager and installation personnel to provide safe and efficient installations worldwide. Provided plans, calculations, testing requirements, and solutions for on-site work. Traveled to job sites supervising on-site activities when required. • Designed tooling, fixtures, and structural components for fabrication, testing, and installation of unique structural and architectural features. • Directed and coordinated product development, improvement, and innovation by empowering and coaching individuals and teams. • Developed customer relationships to ensure understanding of their needs and to establish a good flow of communication during the design, approval, and installation processes. • Supervised factory transition to Lean Manufacturing and 5S implementation.
Education
Bachelor of Science
California State University1981 – 1990
Bachelor of Science