Work Experience
Product Designer
Creative Works2018 – Present
• Designing props using AutoCAD and Sketchup Pro for theme-based laser tag arenas and black light putt-putt courses around the world. • Rendering 3D model images in Adobe Photoshop that are utilized in professional design boards for client presentations and final signature. • Making V-Carve files for router to cut 8'x4' sheets of MDX, MDF, HDPE, Acrylic, and other materials in optimal cut paths for production. • Creating easy to use build and installation documents for wood department and installation team. • Conducting weekly meetings with design team on current and future clients for design and production scope. • Working together as a team with operators and IT support to solve problems in production and with future projects. • Negotiating with vendors to bring new materials in house at lower prices.
Project Engineer
BMWC Constructors2017 – 2018
• Surveyed existing fire sprinkler systems inside all Eli Lilly buildings to create As-Built drawings for M7 records via AutoCAD (95% of time). • Entered record drawings into Eli Lilly's drawing management program EDMS. • Executed weekly safety audits per Eli Lilly and the Alliance group (Industrial Electric, F.A.Wilhelm, BMWC).
Industrial Engineer
Endress+Hauser Wetzer2014 – 2017
• Participated in extensive six-week SAP training from Headquarters (Nesselwang, Germany). • Developed production flows, space requirements, and personnel resource requirements for existing and new activities utilizing continuous improvement initiatives. • Created Work Instructions/Redbooks to train employees on new procedures. • Trained and supported production lines (Electronics Assembly, Tube Welding, Sensor-Insert Fabrication, Thermowell Machining and Thermometer Assembly/Packaging). • Configured SAP to enable new product options for customer order placement through product configurator resulting in $250,000 of new sales in first 6 months. • Prepared BOMs of new products or transfers in SAP which were used for inventory control of entire plant.
Industrial Engineer
Indiana Mills & Manufacturing Inc2012 – 2014
Operated as the sole implementer for IMMI's MES (Manufacturing Execution System), while setting up parts for component validation, fixture validation, and visual representation of part drawings including sub-assemblies for operator use and quality enforcement. • Set up parts through ERP system such as: item container relationship, sub-inventories, weights, various labels, labor events, line operations, and routings. • Assisted in the development and maintenance of process documents such as PFMEA's, control plans, corrective actions, VIS's (visual instruction sheet), and PCI's (process control instruction). • Designed a pick-to-light system that reduced the cost of traditional pick-to-light systems by more than 50% while increasing productivity and nearly eliminating the #1 quality constraint, which consisted of missing or incorrect hardware on products delivered to customers.
Education
Bachelor of Arts
Purdue University2011
Bachelor of Arts