Enrique Ortiz: Automation Solutions Development and Implementation Project Manager in Cartago, C
Enrique Ortiz
Automation Solutions Development and Implementation Project Manager
Cartago | CR
Skills
No information
Interests
No information
Industries
Bike
Summary
No information
Activity
Projects
No information
Work experience
Kore Inc
Automation Solutions Development and Implementation Project Manager | 02/2014 - Current
Management and solutions design for customers' automation requirements, focused on Manufacturing, operations and logistics solutions or as per customers' requirements. PLC programming, automated labeling system, conveyer belt system and others.
Main achievements: Co-designed automated sorting machine controller board and software, remote pressure analyzing equipment redesign and programming.
Managed Projects
- Automated Package Transport and sorting system design, documentation, system Validation and Installation.
- Package identification (labeling) system installation - 10 systems
- Package dimensioning system (160 sensors by 128 sensors (W/H), design, validation, install and documentation.
- 4 line x 40 character displaying system for package Sorting system(s). Software design, Display (controls), documentation, training and Installation.
- PLC to Phoenix contact upgrade install, training and documentation.
- Motor starter replacement contactors install
- Carrier Cell redesign, manufacture, validation, documentation and validation.
- Multi-screen displaying system. Reporting only software design.
- Automated package sorting system disassembly, relocation and reassembly, country wide.
ALPEMUSA (Pequeño Mundo)
Project Manager (Purchasing) | 07/2012 - 01/2014
Main achievements: purchasing process standardization, purchasing lead time reduction per supplier to 50% or less through simplifying processes, new purchasing raw material requirement, analysis proposal and implementation, selective SKU contribution purchasing implementation, SKU reduction from 15K to 6.5K, store selective distribution system. Responsibilities: evaluate product and category sales, coordinate logistics and render lead-time compliance, budget controls and assuring purchase order prepared under business regulations, supply chain flow analysis, including supplier negotiation, approval and shipping of all merchandises, as well as approving re ordering, controlling and monitoring lost / damage goods, establish reduction procedures to decrease damaged goods, returned products, defective product of any kind.
CAMtronics S.A
Business Manager C.R | 12/2002 - 07/2012
Responsibilities: Engineering, planning, consigned inventory requirement follow up, Quality Assurance monitoring, product inspection and acceptance, new product implementation and development.
CAMtronics S.A
Supply Chain Manager | 02/2011 - 07/2012
Main achievements: implemented MRP analysis for purchasing, incoming inspection approval procedures, warehouse process procedure, and new warehouse layout and process flow implementation. Responsibilities: purchase of all raw materials, price negotiation, lead time evaluation, import, allocation and internal distribution, purchased product incoming inspection approval, finished good exports coordination, consigned material returns, warehouse administration of direct, indirect materials and consumables.
CAMtronics S.A
Quality Assurance Manager | 06/2002 - 02/2011
Main Achievements: designed the QA structure for IPC A610, ISO 13485:2003, ISO 9001:2004 and ISO 9001:2008, certification and re certification for IPC and ISO standards, designed and developed procedure for cable assembly production line, cable assembly line downtime reduced in 3.0%. Responsibilities: Quality Assurance (QA) processes, ISO Representative & Audit Leader for the companies Quality System, developed, maintained and controlled the QA acceptance criteria for incoming materials, in line product acceptance and finished good approval, FMA, RCA and investigation to prevent future occurrences.
Project Managements at CAMtronics:
Portico S.A
Production Planning Engineer | 08/2001 - 06/2002
Main achievements: Designed Purchase Order Control System, implemented new production planning system, developed and implemented in process and finished good color coding project, product time study for order behavior. Responsibilities: Production and wood demand planning, monitoring shipment, production compliance and productivity, customer requirements evaluation and on-time support.
Café Britt
Production and Planning Engineer | 11/2000 - 07/2001
Main achievements: Production line process flow optimization, ISO 9001 coordinator for production department, implementation of Spare parts control to reduce machine downtimes. Responsibilities: raw material coordination, roasting scheduling, packing and order processing, production planning and in process throughput analysis.
SMI S.A
CMI (USA) / Production Manager | 12/1999 - 07/2000
Main achievements: startup of the Metropolitan Free Trade Zone plant, Startup plant in Honduras International Trade Center, startup of COSUCA S.A. in Costa Rica. Responsibilities: overall operations Management
Education history
Instituto Tecnológico de Costa Rica
Master in Modern Manufacturing Systems
Universidad Internacional de las Americas
Bachelor in Industrial Engineering | 1995 - 1999
Universidad Latina DE COSTA RICA
MBA | 2008 - 2011
Connections
Companies (0)
No information