Franklin Tatum
Packaging Maintenance Lead/Planner · MillerCoors
Golden, COWork Experience
Packaging Maintenance Lead/Planner
MillerCoors2021 – Present
• Doubled the meantime between stops in 6 months, tripled over the first year. • After Year 1 was given additional responsibilities and budget over packaging general. • Reduced the total PM hours spent by 13% through PM optimization. • Doubled and tripled the lifespan of various pieces of equipment through force reduction, machine modification/redesign, and maintenance strategy optimization, while hitting budget every year.
Contracted Asset Care Engineer
MillerCoors2019 – 2021
• Free up 1,000+ technician labor hours through PM optimization. • Identified and Removed 100k+ of Obsolete Stored Items.

Lift Ops Crew Lead & Snowmaker
POWDR2018 – 2019
• Completed Electrical and plumbing capex and maintenance projects for snow-gun towers. • Performed daily regular maintenance on snowmobiles, lifts, and other critical machinery. • Trained staff on company policies, procedures, and various proper machine operations.
Maintenance Manager
ABB2017 – 2018
Managed 20mill+ worth of profit producing assets (350+ production machines), 8 separate facilities on 2 separate locations. A multimillion dollar budget, as well as 15+ maintenance techs, leads, and buyers.
• Developed & implemented a complete maintenance operations and work order system using smart sheet. ? Visual management created for downtime occurrences, reoccurring issues, & correct prevention ownership. ? Achieved average of 2 or less downtime occurrences (<48 hrs) per month. ? Reoccurring Issues dropped 10% month over month (4 month span) • Management & optimization of vendor relationships. • Budget spend reduction of 15% under the previous 5 year average.
Fulltime Global Operations Intern
Thomas & Betts2014 – 2015
Lean Manufacturing Transformation, Jonesboro Facility, AR • Re-designed plant layout - 25K square foot reduction, Developed and began implementation of 9M multi year plan to bring the facility to world class.
CMMS Implementation - (MP2), Ormond Beach Facility, FL • Created PMs, Produced training material and a process to implement the PM activities using MP2.
Education
B.S.
Center for Mfg. ExcellenceB.S.