FT

Franklin Tatum

Packaging Maintenance Lead/Planner · MillerCoors

Golden, CO

Work Experience

Packaging Maintenance Lead/Planner

MillerCoors

2021 – Present

• Doubled the meantime between stops in 6 months, tripled over the first year. • After Year 1 was given additional responsibilities and budget over packaging general. • Reduced the total PM hours spent by 13% through PM optimization. • Doubled and tripled the lifespan of various pieces of equipment through force reduction, machine modification/redesign, and maintenance strategy optimization, while hitting budget every year.

Contracted Asset Care Engineer

MillerCoors

2019 – 2021

• Free up 1,000+ technician labor hours through PM optimization. • Identified and Removed 100k+ of Obsolete Stored Items.

Lift Ops Crew Lead & Snowmaker

POWDR

2018 – 2019

• Completed Electrical and plumbing capex and maintenance projects for snow-gun towers. • Performed daily regular maintenance on snowmobiles, lifts, and other critical machinery. • Trained staff on company policies, procedures, and various proper machine operations.

Maintenance Manager

ABB

2017 – 2018

Managed 20mill+ worth of profit producing assets (350+ production machines), 8 separate facilities on 2 separate locations. A multimillion dollar budget, as well as 15+ maintenance techs, leads, and buyers.

• Developed & implemented a complete maintenance operations and work order system using smart sheet. ? Visual management created for downtime occurrences, reoccurring issues, & correct prevention ownership. ? Achieved average of 2 or less downtime occurrences (<48 hrs) per month. ? Reoccurring Issues dropped 10% month over month (4 month span) • Management & optimization of vendor relationships. • Budget spend reduction of 15% under the previous 5 year average.

Fulltime Global Operations Intern

Thomas & Betts

2014 – 2015

Lean Manufacturing Transformation, Jonesboro Facility, AR • Re-designed plant layout - 25K square foot reduction, Developed and began implementation of 9M multi year plan to bring the facility to world class.

CMMS Implementation - (MP2), Ormond Beach Facility, FL • Created PMs, Produced training material and a process to implement the PM activities using MP2.

Education

B.S.

Center for Mfg. Excellence

B.S.