Brett Taylor

Brett Taylor

International Project Manager · Blast Deflectors Inc

Reno, NV

In My Own Words

Results-oriented, creative, hands-on leader recognized for exceptional performance while supporting and leading staff and clients through change management. Adept at reengineering business practices and procedures while enhancing delivery of services and increasing competitive advantage and generating cost-savings.

Work Experience

International Project Manager

Blast Deflectors Inc

2017 – 2020

International Project Manager, Blast Deflectors, Inc., 2017 to 2020. Hired to manage multi-million-dollar project budgets and oversee construction for domestic and international projects. Supervise daily operations, client relations, subcontractors, and vendors. Handle HS&E, logistics, site and fleet management, and security. Manage $12M budgets and staffs of 24. • Managed Cambridge UK Ground Running Enclosure, saving $1.2M in project costs. Recruited to take over project, where materials were leading to late project completion. Established rapport and trust with client. Sourced local vendor to produce material. Adjusted schedule to reduce crew size during slow time. Increased crew when material came on-site. Hired outside crew to work on small “details”, allowing main crew to focus on main structure. Brought in additional heavy equipment. Avoided more expensive liquidated damages of 42K-110K GBP. Shaved two weeks off main crew’s table with adjusted schedule. Ensured project was delivered and client was satisfied. • Created and rolled out internal changes, generating $100K cost savings. The company wanted to save operating costs for every project. Re-evaluated shipping and travel costs. Created and enhanced logistic process and job tracking schedules for material transportation / deliver and crews. Increased margins on average 3 – 7% on 60% of jobs completed over three years.

Operations Manager

States and Kingdom

2006 – 2017

Operations Manager, States and Kingdom (formerly Blue 3 Productions), 2006 to 2017. Recruited to oversee all aspects of special event creation and site management, including strategic planning, developing multi-faceted campaigns, and driving innovation for each event. Coordinated and managed event set-up and production. Supervised suppliers and contractors. Secured venues and supplies. Maintained client relationships. Oversaw event budgets of up to $2.3M, security and staff of 120. • Managed creation and production of New Year No Limits event within $2M budget. Red Bull and ESPN wanted live event to look as realistic as possible for world record attempt. Challenged with building a football field in the middle of a parking lot that would also look exceptional on live television. Researched multiple options for turf, astro turf, and paint to determine best structural and budgetary fit. Found and worked with local vendor. Sourced local vendor to donate material after event, reducing waste and site removal costs. Delivered successful event and generated 3.2 million viewership. • Managed production of Bryce Menzies New Frontier, ensuring on time completion. Rally truck driver was doing a documentary and wanted to break the record for long-distance truck jumping. Multi-site location was being utilized by three different companies during the 2-month project. Served as main point of contact with venue owner and other production managers. Worked with multiple contractors, so infrastructure and course construction could be completed on time and on budget. Completed event and load-out time, ensuring venue owner’s satisfaction. • Produced two Red Bull X Fighters event and maintained $2.3M operating budget for both events. Venue had existing infrastructure that created issues in creating a cohesive branding plan and “look” for TV and media. Was able to relocate the building that was creating the issue. Allowing to expand a bleacher, increasing seating/ticket sales by $20k. Ensured a complete single branding plan, that also saved $15k in costs. • Managed and produced Red Bull Straight Rhythm and saved $250K in project costs. A last-minute venue change altered planned set up and layout due to TV requirements in finish area. Seized opportunity to build elevated start platform. Worked with venue to build into and on top of old horse barn. Oversaw logistical transport, onsite installation, course management, and all temporary structures. Served as TV liaison and spectator management. Eliminated budget cost to remove existing structure. Delivered a unique option that exceeded expectations across the board.

Site Manager

Vancouver 2010 Winter Olympics/Paralympic Games

2008 – 2010

Site Manager, Overlay-Mountains, Vancouver 2010 Olympics / Paralympic Games, 2008 to 2010. Selected to provide site management for all aspects of the Alpine venue. Led site design and layout of temporary structures. Oversaw all pre-event ground construction, installation, and removal of temporary structures. Managed budget of CDN $2.5M and staff of 30. • Created and implemented installation plan, saving $100K in manpower. The Olympics used one tent vendor, which did not work for city and mountain venues. Hired to build 30 tents on the mountain for the Winter Games. Created summer plan to help vendor and other teams in the winter prior to competition. Asked tent vendor to supply all tents four months prior to event. Explained how to install tents. Created storage location that was accessible in winter. Saved 60+ man hours of transport and reduced course crew’s stress. • Supervised build-out of men’s and women’s ski racecourses, saving 12% in material costs. The Olympics wanted 52 camera platforms on ski racecourses, and television stations wanted platforms over the A Net. Created a summer/winter build schedule. Constructed six towers over the A Net during the summer. Worked with scaffold vendor to create individual location bundles for remaining 46 platforms. Divided course into thirds, allowing crew to divide work into packages and work unobstructed to build platforms. Devised similar removal plan to reduce rental time and ensured safety of course workers, athletes, and materials. Exceeded client’s expectations. • Handled scheduling and logistics of media trailers, generating 7% cost savings. 120 countries covered the men’s and women’s downhill events. Challenged with loading 47 office trailers into compound behind finish line bleachers. Created schedule detailing each country’s usage timeframe and event requirements. Aligned usage and resources for trailers to be live for scheduled users. Devised load-in schedule, allowing ample time to get trailers on-site and ready. Laid out area for removal once user was finished. Reduced rental length and came in under budget for venue.

Education

BA

The Ohio State University

BA

Industries

Creative AgenciesMoto & PowersportsMusicOutdoorSnowHealth & Fitness