Work Experience
Supply Planning Analyst, North Americas, Survitec Group - Texas, USA
Demand2020 – Present
• Involved in ERP transition project from SAGE to IFS8 and responsible for extensive master data and routes and structure analysis - 49k parts, 230 suppliers, 450 customers and BOM and supported S&OP. • Introduced supplier metrics and implemented supplier scorecard, achieving improved OTD and landed cost for core suppliers - top 30%; $2.3MM. Managed a team of Supply Chain coordinators. • Responsible for stock replenishment, handling MRP signal in a timely manner for the hub and spoke setup - 8 sites across regional Americas, and reduced stock out % to less than 3%. • Designed dynamic dashboards using VBA Macros for monitoring monthly KPIs to compare actual vs target attainment. Developed various ad-hoc performance reports, as necessary. • Performed 10 Box analysis using historical sales data and developed a stock strategy based on frequency analysis and lead time changes. Continuously improved the stock plan to close gaps and achieved $1.3MM in inventory reduction while meeting budgetary targets • Saved $300k in total landed cost of international shipments - Europe & China, by consolidating POs and developing EOQ metrics based on lead time and container capacity • Improved throughput of life raft production from 5.2 days to 3 days by maintaining integrity of MRP parameters - lot/order size, lead time and safety stock • Increased Customer Satisfaction to 93% by managing weekly meetings with Customer service and Supply Chain team.
Supply Chain Associate
Polyset Plastics Pvt Ltd2017 – 2019
• Prepared RFQ's and purchase orders for raw materials and mold fabrication services using ERP software. • Led seasonal agile projects ahead of schedule by optimizing the use of resources and thus saving on budget by 20%. • Worked on cost reduction of 3D printed prototypes by suggesting reduced size prototyping, reducing cost by 50%. • Conducted Root Cause Analysis to identify potential bottleneck operations to meet project deadlines. • Ensured safety stock, re-order points are optimum. Systemized products and product assets using ERP which reduced inventory by 17%. Reusage of mold also increased mold efficiency.
Product Design Engineer
Polyset Plastics Pvt Ltd2016 – 2017
Developed product and mold using AutoCAD and NX and tested product design to check project feasibility based on engineering standards and timeline by sales team. • Followed up with Lawyer and carried documentation throughout the procedures for registering new products. • Conducted inspection of first trial of production before sending the mold to factory to assure quality of mold.
Education
Master of Industrial Engineering
University of Houston2020
Master of Industrial Engineering
Bachelor of Mechanical Engineering
University of MumbaiBachelor of Mechanical Engineering