Scott Oldham
Food Runner · Nisen Sushi
Commack, NYIn My Own Words
I hold a B.S. in Mechanical Engineering from Michigan State University. Graduated in December of 2014. Currently looking for full time positions.
- 3.5 Years of CAD/CAM experience (NX, SolidWorks, AutoCAD, Creo-Elements)
- 2 years of FEA (ANSYS, NX)
- 2.5 years MATLAB experience
Testing:
Force and Moment measurements, Performance derivation, flow visualization for diagnostics, test monitoring, instrument installation, P-I, IP, PID controller experience
Machine Shop Experience:
Lathe, Milling Machine, Drill Press, MIG/TIG welding, Basic CNC programming
Hobbies:
Proficient Alpine/Powder Skier, SCUBA
Work Experience
Food Runner
Nisen Sushi2011 – 2014
- Delivery
- Busser
Student Intern
United/Genmar Electric2014 – 2014
• Developed accurate electrical riser diagram specification counts for requested clients
• Gained an adept understanding of electrical design in fitting various electrical components (Entrance Panels, Emergency Panels, and Lighting Subpanels etc.) into architectural specs.
• Provided detailed electrical estimates using a computer program to acquire bids for future clients
Summer Internship (SULI)
Brookhaven National Laboratory2013 – 2013
-l performed thermal and vibration measurements on the floor, supports and magnets of the NSLS-II Storage Ring.
-Used data analysis (Labview) and modeling to determine the sources of thermal and vibration instabilities to mitigate their effect on the electron-beam stability.
-Optimized design parameters of X-Y stages which were utilized to position Glidcop "Slits" for beam-line use.
-Collected vibrational data on proposed Green sites for the NSLS II, to understand current ground resonance.
Student Engineer intern
FRIB-Facility for Rare Isotope Beams2012 – 2013
-Assisted in the development and design of a SRF high bay (Completed Construction) to house superconducting radio frequency technical facilities at MSU including the following designated areas: incoming accelerating structures (cavity) QA and inspection, cavity hydrogen de-gassing furnace, cavity processing and cold-mass assembly facilities, power coupler conditioning, vertical cavity test area, cryomodule test facility, test facility control room, and cryogenic systems.
- Developed an adept understanding of SolidWorks by re-dimensioning cryomodule components to prepare for Engineering Change Order (ECO) process.
-Researched vendors (Parker, McMaster-Carr etc.) that manufactured specific parts needed for the construction of various components.
Education
Bachelor of Science (B.S.)
Michigan State University2010 – 2014
Bachelor of Science (B.S.)