AD

Adam Derabin

Sr. Operations Manager · Performance Team Freight Systems

Oakhurst, CA

In My Own Words

Distribution/Logistics Senior Operations Manager with 10+ years in high-volume/high-speed operations, across varying business models (direct-to-consumer as well as third-party logistics). Established measurable success at managing many facets of distribution systems, while also developing my teams to continue principles and disciplines of successful execution.

I will bring experience developing operations metrics and analytics as well as on-the-floor staff engagement to constantly challenge and improve the operations I manage, while developing solutions that are durable enough to become standardized processes. As you will see, in my resume, my experience is not limited to general warehouse management, but also project management, sales management, and even a little finance management.

I recently moved to Central California (Oakhurst), from Huntington Beach, California, with my wife and two children, in order to assist my mother in Oakhurst. Unfortunately, this meant that I had to voluntarily leave my previous position (Senior Operations Manager), at Performance Team Freight Systems, in San Pedro (Long Beach). Now that my mom is doing well, I am open to moving our family from Oakhurst back to the Southern California region.

Work Experience

Sr. Operations Manager

Performance Team Freight Systems

2013 – 2015

Senior Operations Manager – Processing Operation (April 2015 – September 2015) Promoted to SOM following successful period as Operations Manager. Responsibilities included management and development of 300 operational staff, 20 supervisors, four shift managers, and two operations managers. Provided high-level direction/motivation of Processing operation continuous improvement initiatives as well as development-of corresponding success metrics relating to each initiative. Cumulative output of all areas under my management averaged 1MM units/week; peak-weeks 1.5MM units. Quality and accuracy of ticketing and packing of goods were of paramount concern, and audited frequently.

Re-organized leadership structure, to better match skills/capabilities of existing management staff with requirements of each operational department. Applied metrics-based strategy towards increasing productivity and profitability within newly-assigned operation segments. This process, used successfully in my previous Operations Manager-North Processing role, improved productivity, reduced overtime to 2% of labor hours (from 10%), reduced turnover, and increased staff morale. Key to the success and durability of improvements was ensuring managers understood, bought-in, and took ownership of portions of each improvement initiative relative to their operations. At time of my departure, left Processing operation as most profitable operation segment in PT-Homegoods business unit.

Operations Manager – North (Small-SKU) Processing Operation Responsibilities included management of 110 operational staff (130+ during peak operation volumes), eight supervisors, and two shift managers. North Processing unit volume averaged 40% of DC output, which consisted of client merchandise of the smallest physical size. Developed previously non-existing metrics database, which was used by our operation as a tool to assist with labor modeling and performance tracking. Using the database, unit volume growth projections, and staff productivity metrics, I generated a labor planning model, which defined staff requirements for management team to follow. Continuous improvement initiatives led to operational improvements that reduced steps, minimized decisions, and also improved safety. Our company-wide safety metric - Accident Frequency Rating (AFR) was frequently the best or nearly the best or all operational areas in the DC. As a result of these combined efforts, the North Processing team was measured as the most profitable operation for 12 consecutive months.

DC Operations Expansion Consultant/Planner Contacted by former McMaster-Carr warehouse director, now Performance Team warehouse director, to work as a consultant to assist re-design of warehouse operations. Using input from all available sources as well as constant design testing and tweaking, I generated layout designs that were safe and increased productivity.

Operations Manager

McMaster-Carr Supply Co.

2002 – 2012

Operations Manager – Outbound Small Parcel Operations October 2009 – July 2012 Responsible for meeting daily operational success metrics, continuous improvement, and development of three operational supervisors and 30 full time employees. Managed accurate and efficient operations that shipped 12,000-13,000 parcel shipments among eight different parcel carriers and 500 will call orders each day. My operations consistently exceeded daily performance KPI goals through analysis and continuous improvement of fixed positions, as well as disciplined execution of objectives. Our improvements allowed my departments to maintain the same number of employees each year, even as order growth increased. Our success also helped our department contribute to the warehouse-wide goal of placing each shipment on a carrier’s trailer within one hour of order-submission, greater than 99% of the time. Of the less than 1% that did not meet that goal, I led my supervisors to analyze the causes of the failures.

Manager - Financial Control July 2009 – October 2009 Finance operation, responsible for performing control audits of various information weak spots within the organization. Financial control reporting and audit performance of each area was presented monthly to corporate finance controllers.

Project Manager – DC Expansion August 2007 – July 2009 Selected to manage a three-million-dollar warehouse conveyor layout and operational improvement expansion project. This project was the planned expansion of the general layout re-design I supervised in 2004-2006. Responsible for the design, risk assessment, proof of concepts, pricing negotiation, lifespan projections, integration planning, logistics of component delivery, implementation, and commissioning. Held weekly meetings with all management to share the progress of the project, writ-large, discuss design ideas, invite criticism, solicit ideas, and prepare for upcoming milestones that we were preparing-for. The final layout design reduced our staffing requirement by ten full time equivalents and prepared all affected departments for six years of order growth. At the conclusion of the project, published a project summary document detailing the work done, logic of design decisions made, as well as the expected lifespan of each component, using year-over-year projections of efficacy.

Of the several process improvements achieved by the end of this project, an automated conveyor tote routing system, I began with a small local-PC-driven pilot, had the furthest reaching impact. Saving six full-time-equivalents at our facility, the idea and method for achieving the accurate routing of merchandise along our conveyor system was taken as a companywide capital project. This brought the idea to all six branches within the McMaster-Carr network, as well as a yearlong IT Systems project that integrated the logic into the mainframe system, which controlling distribution of work at each DC.

Sales Manager – Web/Email Sales March 2006 – August 2007 First position as a department manager, and first position not working within the warehouse operation. Managed three supervisors and twenty-three full-time employees (most tenured 20+ years; some 30+ years) in the Non-Phone Order Entry sales department. The department was responsible for accurately and efficiently entering around four thousand emailed, faxed, and web-generated customer orders daily. Average handle time for each unit of work was the KPI used to compare the performance of our Non-Phone Order Entry department to those of our sibling branches. My department performance consistently improved while I was the manager, going from poorest level among all network branches, when I arrived, to consistently operating #1 or #2 by the time I moved.

Project Supervisor – DC Expansion June 2004 – March 2006 Selected by executive management as one part of a two-person team to design, implement, and commission a three-million-dollar department relocation/conveyor expansion. As the project supervisor, I was responsible for the effective design, implementation, and commissioning of new system. Successful execution of the project led to increased productivity, efficiency, and improved ergonomics. Focusing on many small and durable improvements, the resulting design of the work areas required less steps to complete work, less clutter in all areas, less stress exertion on bodies of employees, and increased productivity. Upon completion of the project, management representatives from all member branches visited our facility and adopted many of our designs for implementation in their respective expansion projects. I was responsible for leading discussions that included the company CEO, president, and vice presidents, where we presented our design logic and returns from the project.

At the conclusion of the project, I published two documents (available for review upon request) detailing the work done, logic of design decisions made, as well as the expected lifespan of each component, using year-over-year projections of efficacy. Accurate long term growth calculations (five-year projection base), through data modeling, drove design elements of this expansion, to require minimal downtime of active operations, while also keeping project cost low and quicker to execute.

Supervisor – Order Assembly/Shipping August 2003 – June 2004 First position directly supervising employees. Responsible for employee development, employee performance evaluation writing and administration, continuous improvement, and supervising day-to-day operation.

Project Lead – DC Expansion June 2003 – August 2003 During the summer of 2003, worked as part of an in-house construction team, responsible for building material storage racks as part of a merchandise storage expansion project. Led small groups of summer college interns as well as temporary workers towards completion of daily objectives.

Staff – Order Assembly/Packing July 2002 – August 2003 Hired as non-management full-time employee assembling and packing customer orders for shipment via small parcel carriers.

Education

BA Business Admin. - Management

Whittier College

1997 – 2001

BA Business Admin. - Management

Industries

BikeFashionLifestyleOutdoorSkateSnowStreetwearSurf