JS

Jeffrey Schiller

Cost Engineer · Axis Solutions

Littleton, CO

In My Own Words

A dynamic and results-driven engineering professional with wide-ranging experience in computer-aided design, project and program management, root-cause analysis, and manufacturing and quality support, as well as product research, design, and development. Possesses a proven track record of building profitable relationships in the oil and gas and automotive industries. A reliable producer who leverages practical experience with strong problem-solving abilities. An analytical evaluator who identifies areas for improvement and implements forward-thinking strategies to increase operational efficiency and product quality, making significant contributions to the long-term success of an organization.

Work Experience

Cost Engineer

Axis Solutions

2014 – Present

Generated new business development by providing proposals and developing relationships with General Constractors. Reviewed previous bids to determine specifics for new proposals. Evaluated current jobs’ actual versus planned expenditures to provide more accurate future proposals. Served as initial point of contact for potential customers and suppliers.

• Contributed to securing 12 new jobs. • Managed database of product pricing and production rates to reduce worker hours required for bid generation.

Completions Consultant

Shell Exploration & Production

2011 – 2013

Subsea Completions, Houston, Texas, 2013

Audited design certification process of supplier equipment to ensure product fit for purpose. Tracked key metrics related to completion and competitor performance, for presentation to management.

• Created database of downhole equipment used in deep-water wells in Gulf of Mexico. • Developed well handover document template listing required attachments in desired formats.

Completions, Denver, Colorado, 2011-2013

Organized scheduling of well intervention activities between office and field personnel. Resolved well follow-up issues. Tracked key performance metrics of completion process for presentation to management. Recommended options to improve operational processes and increase performance. Reverse-engineered ceramic disk tubing sub to optimize tubing installation process. Completed time study analysis of competitors’ completion processes to determine areas of process improvement for company. Oversaw QC working with team in Calgary to review, modify, and approve well bore diagrams; played key role in Pinedale asset, finishing approval process first among land operated assets.

• Reduced time required for completion foreman by organizing schedule by well locations. • Provided production engineers better understanding of what actually occurred during well intervention activities. • Produced summaries of completion activities for quick and easy review by management. • Lowered cost of well-intervention activities. • Optimized current process. Also, determined alternate solution for breaking ceramic disk. • Developed Design of Experiments along with economic analysis to evaluate each solution and help determine best approach moving forward. • Determined completion process bottleneck and developed recommendations to minimize overall downtime.

Senior Project Engineer

Johnson Controls, Inc,

1999 – 2005

Senior Project Engineer, Supplier Product Development, 2003-2005

Worked with external mechanisms suppliers to develop new products for use in internal systems. Served as engineering focal point for internal customers and external suppliers. Reviewed supplier-generated design and process documents to ensure products met internal system design requirements. Used root-cause analysis to fix issues with JCI complete seat assemblies using externally supplied mechanisms through analytical analysis, product development, manufacturing support, and laboratory experiments (testing). Worked with multiple internal and external parties to develop new products; products used in Nissan and Acura lines.

• Became subject matter expert in externally supplied products. • Created new products that are still in current production. • Mentored new engineers within department into individual contributors to increase team productivity.

Project Engineer, Second Row Core Mechanism Development, 2002-2003. Used root cause analysis to overcome development issues. Generated engineering design documents, such as DFMEA drawings and engineering specifications based on seat system requirements. Organized and performed design verification testing. Determined product met seat system requirements for strength and operational durability. Supported mechanism and complete seat plants during prototype builds and production start-up. Worked with manufacturing to organize the assembly process and end-of-line testing.

Project Engineer, Advanced Mechanisms, 1999-2002. Modeled new mechanisms to provide desired functionality to automotive seating systems. Analyzed kinematic motions of mechanisms and seat systems to determine loads and accelerations. Worked on multi-discipline team to determine product design content, cost, and feasibility.

Drilling Engineer

Shell Deepwater Production

1998 – 1998

Provided project management for well design and drilling and completion support for deep-water oil and gas wells. Interfaced with multi-discipline team and service companies to optimize well plan objectives and determine AFE. Started drilling field assignment to become fully functional drilling engineer. Analyzed and recommended renegotiating drilling rig contract reducing costs by $200K per year. Optimized casing design to withstand anticipated loading while minimizing cost. Investigated upgrading top drive to decrease drilling time for longer length wells. Oversaw drilling and completion operations in field.

Product Engineer

Bosch Automotive Motor Systems

1996 – 1998

Managed new projects and expedited progress toward completion according to schedule. Organized and performed testing of new products to eliminate potential warranty recalls. Determined root causes of A/C blower motor failure modes and successfully implemented design and quality processes solutions reducing warranty costs by 25%. Implemented incoming component testing procedures to eliminate future failures. Used FEA and natural frequency determination with laser vibrometer to reduce airborne noise and transmitted vibrations (NVH) by 10%.

Education

BS

Lehigh University

1990 – 1994

BS

MS

Vanderbilt University

1994 – 1996

MS

Interests

CyclingLacrosseSwimmingAutomotive rally

Industries

BikeLifestyleSnow