John Gaboury

John Gaboury

Production Manager · K-tube Technologies

Chula Vista, CA

In My Own Words

Over twenty years leadership experience in a manufacturing environment. Led production operations, created leadership training and growth path, reduced cycle time, improved productivity, improved on-time delivery performance and controlled material costs.

Work Experience

Production Manager

K-tube Technologies

2004 – 2015

Member of Executive Team, reporting to President of K-Tube. Full responsibility for production operations, materials, shipping/receiving, and maintenance. Primary goals have been to increase leadership abilities among supervisory staff, create leadership bench strength, and improve manufacturing efficiency and quality.

Production Ensure flow of product including scheduling/planning, manufacturing effectiveness and materials/supplies availability. Key Performance Indicators (KPIs) tracked are On-Time Percentages, Errors & Defective Material, Production Hours, and Supplier Performance. Maintenance All production maintenance including machine installations and repairs. Support facility maintenance needs. KPIs include Machine Hours Down, Machine Failure Root Cause, and On-time Preventive Maintenance. Safety Committee Permanent member, providing leadership and partnership to ensure safe practices throughout the plant. Executive Team Core member of strategic management team. Collaboratively developed short and long-term strategic goals for K-Tube.

ACCOMPLISHMENTS: • Succession Planning Defined and implemented new developmental leadership position in Production Department. Combined with creating and implementing a training program for existing and new supervisors, this developed a pool of readily available future leaders. • Safety Through ergonomic analysis and process evaluation, implemented process changes and tooling/machine upgrades resulting in reduction of work-related accidents and injuries from about 5 per month to about 1 per two months. Set record of 865 days with no lost time injuries. • Systems Oversaw development and implementation of scheduling system improving planning and purchasing accuracy. • Training Developed and conducted training on subjects such as production processes, problem-solving, and team-building.

Production Manager

POLESE COMPANY, INC.

2000 – 2004

Reported to President. Promoted during tenure from Production Control Manager to Plating Manager then Production Manager. Responsible for manufacturing in all facilities. Focused efforts to improve metrics through process control and developing people leadership skills of supervisory staff.

Plating Manager Plating was standalone operation. Responsible for engineering, laboratory, maintenance and production. Production Control Manager Responsible for planning, buying, and inventory based upon sales priorities. Partnered with production leadership to execute schedules.

ACCOMPLISHMENTS: • Promotion Promoted twice within 4 years, ultimately to lead production in all 4 buildings with 10 supervisors and 200 production employees. • Operational Effectiveness Improved yields and operational effectiveness through coaching and leading the production leadership. Increased throughput 20% and improved yields 25%. • KPI Improvements o Improved on time results from 75% to 90%. o Reduced costs through reducing Work in Progress and streamlining processes. o Improved bottom line from net loss to break even.

Scheduler/Planner

INJECTAMAX, LLC

1998 – 2000

Injectamax was a privately held company that provided metal injection molded components for the dental, firearms and medical industries. It has since been acquired by public company FloMet. In 1999, Injectamax had approximately 60 employees.

Scheduler/Planner Responsible for scheduling all production areas, reporting order status to sales, scheduling and procurement of raw materials, inventory management and supplier communications.

ACCOMPLISHMENTS: • KPIs Improved on-time shipments from 50% to 90%. • Process Improvement Per executive request, provided written recommendations to partner company regarding productivity and on-time issues. Within 3 months of implementing recommendations, partner company obtained record productivity and on-time measures.

Manufacturing Manager

ALCOA ELECTRONIC PACKAGING INC.

1987 – 1996

Responsible for 6 production areas including about 150 production operators, 6 supervisors, 2 engineers and 3 technicians. Responsibilities included hiring and firing, performance appraisals, timecards, Gold inventory, and production performance. Division was a startup, requiring much of the infrastructure to be developed including production systems and organizational structure.

ACCOMPLISHMENTS: • KPIs o Reduced cycle time of responsible production areas from 14 days to 7 hours. o Increased capacity from 3Kpcs/day to 50Kpcs/day with keeping 7 hour cycle time. • Safety Improved safety in a microscope inspection area by reducing ergonomic injuries through implementing required stretching techniques. • Excellence Award Received Alcoa Excellence Award for environmental safety.

Education

Certificate

UCSD Extension

1996 – 2004

Certificate

Certificate

UCSD Extension/Aloca

1987 – 1988

Certificate

Industries

Moto & PowersportsOutdoor