Martin Rodriguez
Senior Project Manager · Fiedler Group
Orange, CAIn My Own Words
MARTIN T. RODRIGUEZ
Orange, California 92867
Email: martintr1221@gmail.com
Mobile: 714-366-6369
Hello Human Resource Representative,
I possess over two decades of progressive expanding design and construction project management experience in nationwide Interior Improvements and Ground-up Retail construction for: Retail Tenant Improvement Rollouts, Amusement Parks, Logistic Centers, Shopping Centers, Restaurants, Parking Structures, and miscellaneous Capital Improvement projects. As the Project Lead I am focused on managing and working with all stakeholders, consultants, sub-contractors and vendors with project communication, schedule, budget, and leadership.
Also, though not represented in my Resume, my career experience between 2005 to 1985 and I worked with: Guess? / Baby Guess? / Guess? Footwear, Rampage/ Friends, Footlocker, Wet Seal / Contempo Casuals / Limbo Lounge, Miller’s Outpost/ Levi’s, Trak Auto, Arron Brothers and Clothestime. My role at these was to Design, Manage, Construct, Coordinate and Material Procurement for New Store Rollouts, Remodels, Relocations, and Store Closures for over a thousand locations.
In these roles, I was tasked with many responsibilities associated with Tenant Build-Out and Implementation. These construction projects ranged from $150k to $105m. Additionally, managed from project Inception to Certificate of Occupancy several ground up projects ranging from $550k to $185m.
To help illustrate, I have listed a few points, they are as follows:
SUMMARY OF QUALIFICATIONS:
• Familiar with SCAQMD, ADA, Building, Fire Life Safety and Health codes.
• Site safety, including OSHA/DOSH codes.
• Proficient in Expedition, Procore, MS Project, Word, Excel, Outlook, and Power-point.
• Pre-qualify, hire, and oversee architects, consultants, general contractors, and suppliers.
• Manage multiple projects requiring effective interaction and coordination.
• Competent in negotiation and problem solving.
• Able to make decisions independently or with stakeholders tactfully.
• Project lead for: scope, budget, costs, design, and construction.
• Experienced in project management, store relocation and turnover procedures.
• Directs architects & engineers in the production of contract documentation.
• Comprehensive knowledge in site assessments and conducting due diligence.
• Strong working knowledge of contract negotiation and contract awarding
• Detailed in reviewing: Material Submittals, RFI’s, PCO’s and issuing FD’s for CD deficiencies.
• Experienced in lease exhibit negotiations between Tenants, Landlords, and Owners.
• Experienced in “Tenant Improvement” and “Ground-Up” construction.
• Adept in conducting meetings with Stakeholders, Management, and Governmental agencies.
• Excellent interpersonal skills, strong listening, and written communication skills.
• Ethical, self-motivated, team player, goal orientated and Able to travel.
In closing, I would like to thank you in advance for this opportunity and I look forward to sharing my experiences and capabilities with you and the client.
Sincerely,
Martin T. Rodriguez
Work Experience
Senior Project Manager
Fiedler Group2019 – 2020
Architectural and Engineering firm - Provided engineering, civil and construction management services for petroleum and alternative fuel industry. Managed six clients with a project load of 33 locations which included: ? Lead the project to meet the clients project requirements and approvals. ? Attend, process, and obtain agency approvals from Community Hearings, Entitlement Planning Hearings and Environmental agencies to ensure that all utility service applications, reviews, and approvals were coordinated for each client's project to avoid costly scheduling delays. ? Manage and review all site logistics, utility distribution and connectivity. Oversaw all construction documentation were prepared per the governing agencies which included Civil, Architectural, Electrical, Mechanicals and Plumbing, Structural, Landscape and Fuel per State and Local requirements. ? Oversaw the entire construction document process and would submit and manage COR's, RFI's and Material Submittals and Payment Applications. ? Reason for leaving: Laid off due to Covid 19
Senior Project Manager
Bergman KPRS National2017 – 2018
General Contractor - Construct and managed ground up, tenant improvements: ? Assisted the Sr. Project Manager II on a 11,000 square foot two story Ground-up Corner Strip Center with a two-story parking structure, a full-service car wash and a 30' tall x 375' long pinned retaining wall. ? Managed and orchestrated all site utility services the implementation and connection to the POC's and Distribution Centers. ? Reason for leaving: Laid off due to Company downsizing.
Senior Project Manager
Lupine Construction & Development2016 – 2017
Charter School Educator across seven states with three divisions of schooling: ? Managed the construction of 14 school locations, 4 relocations and 6 remodel locations over three states. ? Developing and implementing contract practices, policies and procedure and material standards. ? Coordinated and award trade contracts, material contracts and professional service contracts. ? Perform site selection and analysis on the estimated costs of the build out. ? Orchestrated the closure of 27 Charter Schools and coordinated the recovery of the FF&E assets. ? Reason for leaving: Recruited to Bergman KPRS.
Senior Project Manager
Craig Realty Group2014 – 2016
Nationwide Outlet Center Developer: Managed twelve Regional Outlet Centers with an annual portfolio responsibility of $9.6m to $185m: ? 52-acre San Clemente Outlet Center property with all site improvements which included: Managing and overseeing a Two Story 1,100 stall parking structure; a 425-ft. long bridge spanning over an Army Corp and Coastal Commission canyon, Landscaping implementation, a GLA of 425,000-sf for retail, food, offices, 11 elevators, 2 sets of escalators, 2 loading dock-leveler tenant spaces and all Utility implementation and Distribution of all Electrical, HVAC, Site Lighting and all Signage for the Center and Tenant spaces as per state and Local codes. ? An existing Outlet Center Food Court face-lift in Athens, Arizona, which included: RTU replacement, Floor tile improvements and upgrading all FF&E while staying open for business. ? An existing Outlet Center in Los Angeles and constructed a 8,500 sf ground-up free-standing two-story Logistic Center (storage facility), which included: new electrical distribution, lighting, a freight elevator and an ADA compliant Restroom. ? Reason for leaving: Laid off, the project was completed.
PROFESSIONAL EXPERIENCE, CONTINUED:
Project Manager III
Disneyland Resort2006 – 2013
Campus entertainment - Designed, managed, and facilitated building upgrades and improvements. Managed an annual portfolio between $5m to $14m - herein are several key projects completed: ? Implemented from inception to occupancy of an 8,700-sf 2nd Floor HealthCare Clinic. This facility required the remediation of hazardous materials prior to the installation of a ADA gurney accessible elevator, six Exam Rooms, an X-Ray Room, three Dr.'s Offices, with a 2,500-sf Physical Therapy Clinic and several ADA compliant restrooms along with a 3,500-sf Pharmacy. ? Implemented a new 2,880 sf "Partners Credit Union" tenant improvement within an existing building. ? Emporium retail store with a multi-phased rehabilitation. This store is the highest volume store at the Resort; I was tasked to implement a new: ADA exiting strategy, 28 POS stations, Lighting and Lighting Control package, HVAC compliance to Title 24, and all wall and floor merchandise fixture replacement. This was a "No Down" project and was completed 1 month ahead of schedule and per budget. ? Managed the design and implementation of Resort Wide Emergency Communication Systems. The objective was to obtain 90% Resort Wide Coverage and maintain the existing 800 MHz system as redundant coverage; upon completion and commissioning we obtained 95% coverage to the Resort property, which included: Tom Sawyer Island, attractions, retail spaces, dining rooms, kitchens, basements, attics, hotel rooms, storerooms, restrooms, tunnels, service maintenance bays, BOH shops, off-site warehouse facilities, and all parking structures and lots. ? Tasked with upgrading the Pirates of the Caribbean, Small World, Haunted Mansion and Splash Mountain attractions to meet current Integrated Security Systems (ISS) fire codes. Our requirements included implementing smoke detection (VESDA), fire alarm, and smoke evacuation systems that interacted with ride controls, attraction lighting, and sound spiels to inform our Guests within the attractions and associates buildings. ? Issued last minute projects to meet year-end budget obligations to meet fiscal year-end financial obligations. These projects included: Design and construct an 80' long Back-of-House pedestrian bridge to get Cast Members from one park of the park to the other; also design and construct a security gate system to secure the firework ordnance when it was being moved to the launch areas. ? Reason for leaving: Leave of absence.
Director, Studio Design Manager
Merle Norman Cosmetics2005 – 2006
Nationwide franchise retailer for women's cosmetics - 1,800 studio locations across the United States. ? Oversaw a staff of 7 to design and implement over 150 locations. I was responsible for the design and FF&E procurement package for each franchised location. ? Review all new and existing branches, remodels, and relocations of studio sites. Contact each owner and discuss the step-by-step process on the chain of events that will be taking place on their project. ? Manage and oversee all FF&E rollout procurement programs and developing new means for cost savings; implemented 38% savings in acrylic display fixtures, 32% savings in pre-manufactured cabinets, and 23% savings in freight. ? Reason for leaving: Recruited to Disneyland Resort