Rene Kenerly

Rene Kenerly

Logistics/Move Project Consultant · Toll Forward Logistics

Los Angeles, CA

In My Own Words

Dear Hiring Manager:
As a seasoned Supply Chain Management professional with excellent qualifications, and a strong desire to continue excellence in this profession, I am seeking to align myself with a company positioned for strong growth. The scope of my experience includes Demand Planning, Inventory Utilization, change Management, Clear to Build, Process Optimization, Individual Development, Lean, Cost Reduction, Business Re Engineering, and Project Management. Capitalizing on my achievements in several engagements, I am seeking a professional opportunity where my experience can benefit your company. With this goal in mind, I have attached my resume outlining my qualifications.
Here are a few of my significant achievements:
Reduced outbound truck freight by $50K and $60k in FedEx freight cost in 7 months.
Championed Lean program for transition from procurement of sheet material, to purchasing laser cut or pre sheared material, eliminating bottlenecks in the Shear and Laser Work Centers, and significant reduction of raw material scrap, with potential annual savings exceeding $6M per year.
Created Hardware Kits, resulting in elimination of lot mixing, and over 40 man hours/week in manual pick of hardware and transaction processing.
Selected / qualified new higher quality, lower cost fabrication vendors, resulting in reduction of machined part cost by 45%.
Reconciled over $2M in problem invoices.
Deployed Glovia ERP system as Project Manager on aggressive three month schedule.
Cleaned up two years of material in MRB in three months, and $1M in E&O over a 6-month period.
Improvement in inventory accuracy from 65% to 99%, and elimination of physical count.
Leader of matrix team, which established hardware and software specifications, for selection and implementation of new business computer system on aggressive 6-month schedule. Cleaned up database in 3 legacy systems for migration into QAD ERP system.

Work Experience

Logistics/Move Project Consultant

Toll Forward Logistics

2019 – 2019

Project Manager for startup of new warehouse in Long Beach CA

Director of Supply Chain Operations & ODOO ERP Implementation Consultant

Occupancy Permits, Safety, Security

2017 – 2018

Defined &Tracked Project Plan, Facility repair, Equipment installation, Occupancy Permits, Safety, Security Director of Supply Chain Operations & ODOO ERP Implementation Consultant American Barbell Las Vegas, NV 11/17-5/18 ERP Implementation Project Manager/Planned and executed facility move from San Diego to Las Vegas. Managed Logistics, Procurement, and manufacturing. Set up new warehouse, including warehouse Stocking locations. Managed conversion from QuickBooks to ODOO ERP System. Data cleanup and migration, Managed training of staff, including ERP system and all functional areas. Initiated Quality inspection of outbound shipments to minimize errors.

Supply Chain Demand Planning Consultant

Core Molding Technology

2017 – 2017

Tier one automotive supplier of molded body parts for Semi Truck Manufacturing. Setup and Run Analysis. Maximized run quantity to amortize setup over run and minimize long tool setup, Reorder point Analysis. Plan vs. Actual Analysis with root causes identified and addressed. Define EOQ values to minimize tool change out. Maintenance Schedule. Company currently uses Excel to track data. Defined justification and scope for selection/implementation of relational database ERP system, to achieve real time data.

Distribution Center Management Consultant

Carter Fuel Systems

2016 – 2017

Distribution Center Manager at Tier One Automotive Part Distribution Center for automotive fuel delivery systems. Transition of product manufacturing from US to China. Identified over $5M in excess inventory for sale to new distribution Channel. Processed over 43000 items in RMA system. Identified over 65000 of trapped inventory parts for sale through distribution channel. Improved Fill Rates from 84 to 96%. Wrote procedures for RMA Processing, MRP Processing, and Inventory Control and Forecast demand.

Transition Supply Chain Manager

GKN Driveline

2016 – 2016

Automotive Tier 1 Company that manufactures automotive driveline assemblies. turnaround of troubled Supply Chain organization. Trained staff of 22 Planners in Production Planning, including 47 work center machining centers, in a failed SAP environment. Defined optimization of setup/run. Wrote recovery plan. Cleaned up work center stocking locations, by back flushing already completed assemblies, to correct inventory accuracy, resulting in reconciliation of over $3M. Performed assessments, reset min-max levels, wrote process procedures for warehouse, Cycle Counting, Engineering Changes, and Process Flow.

Purchasing Manager

The Olander Company

2015 – 2016

Fasteners Distribution Purchasing Manager of 3 Business Units. Turnaround of Materials organization, management of E&O material, velocity reduction of incoming materials by demand changes, resulting in increase of turns. System setting changes, documented procedures, and development of untrained staff. Most recent result was $200K inventory reduction in one month. Negotiation of freight cost, resulting in 30-50% discount of UPS shipments. Created metrics for MRB processing, returning rejected material to supplier for credit. Sell back of $2M of obsolete product.

Materials Manager -Consultant

Zodiac

2015 – 2015

Aircraft Interiors Management of Planning, Purchasing, & Stockroom. Mapped out recovery plan for resurrection of failed Lawson M3 ERP implementation. Cleaned up 4800 non-essential Work Orders uploaded during Go Live, and 4000 non- Essential PO's, to run successful MRP. Corrected 3000-part planning setups, performed Physical Count to recover several stock items not showing up on cycle count. Improved aging in receiving from 35 to 3 days.

Production Control, Logistics, Operations Director Consulting Manager

Faurecia North America

2014 – 2014

6th largest automotive parts manufacturer in the world. Managed 7 consultant staff, while assuming functional role of Operations Manager of over 3000 employees on 3 shifts. KPI's included Min Max update process definition, Rollout and Training of existing Process Definition, Supervisor Management Training, and Alert reduction for items below Min level. Disposition of 52 trailers of obsolete product via sale.

Assistant Operations & Project Manager GE Transportation

Project Manager

BNSF Railway Repair facility

2012 – 2013

for implementation of new Business Model between BNSF and GE. Defined and cataloged over 6000 tools. Managed all tool repair, calibration, and procurement. Clear, concise communication skills in conjunction with organizational skills to perform daily duties. Developed and implemented improved policies. And procedures, resulting in improved efficiency and productivity.

Materials Manager

Amonix

2011 – 2012

Oracle ERP Implementation Team Member/Supply Chain Manager Embedded with contract manufacturer Flextronics. Primary function was to assure on time delivery, to site where largest CPV solar installation in the world was in process in Alamosa Colorado. Defined process and procedures, defined material requirements and build plan. Lead implementation of RMA, and Inventory Control system in Oracle ERP system. Created Purchase orders for delivery of product from manufacturer to site, managed Logistics to and from site, and created RMA documents in Oracle, for return of material from site. Managed all MRO Procurement, Equipment Rental, and Logistics.