Carlos A. Granados
San Marcos, CAIn My Own Words
SUMMARY
Industrial engineer with specialty in manufacturing systems. 18+ years experience in plastic injection molding process and manufacturing in medical, office and irrigation products, Effective management and leadership of an engineering group in charge of process development and improvement. New product development, Mold design modification, troubleshooting and process validations under ISO and FDA regulations. In charge of molding production group responsible for production schedule accomplishment, mold repair and mold maintenance control.
EDUCATION:
B.S., Industrial Engineering, ITESM, Campus Sonora Norte 1997
ISO-9000, CIM, Scientific molding, Injection Mold design, Six Sigma Master Black belt.
PROFESIONAL EXPERIENCE:
HUNTER INDUSTRIES
MANUFACTURER OF SPRINKLERS, ROTORS AND VALVES FOR COMMERCIAL AND RESIDENTIAL IRRIGATION SYSTEMS
Process Engineering Manager 2015 – Actual
- Leader for the Process Engineering team in charge of the injection process development for NPI
-Molding process optimization based on scientific principles
-Part and Mold design review. New Product Development Tooling and manufacturing departments to optimize mold design and keep mold shop floor standardization.
- Decoupled Molding Methodology implementation focused in developing Molding technicians skills for diagnose and effective troubleshooting.
- Molding capacity Model. Machinery and equipment specifications.
- Molding shop floor support focused on process reproducibility Improving 1st pass yield, eliminate mold cavity blocking and minimize part rejects.
Molding Manager 2010 to 2015
• In charge of process engineering and molding production teams for 78 molding presses from 30 to 600 tons
• Custom molding division start up. Develop robust molding processes for automotive, premium packaging and office products.
• Implementation of Real time molding floor shop monitoring system (Plantstar) consolidating efficiency, productivity and quality to optimize OEE monitoring
• Material control. Reduced 45K inventory implementing Kan Ban for resins, concentrates and packing material. Gained 1500 sq. ft. at staging and molding floor modifying molded parts flow by consolidating inspection, counting and capturing operations in one step single stations.
• PGJ automation project. Transferring of 42 molds including new Micro molding processes for rotor’s internal components
• Coordinate new products implementation. 3” High pressure valve 12 molds GF nylon. Ac solenoid in house production integrating winding, automation and vertical overmolding operation in a production cell.
• Added secondary operations in line with molding machines based on lean manufacturing eliminating subassembly operations in assembly area.
• Implementation of In house Tool Room with CNC capabilities to eliminate outsourced mold repair and maintenance. 1.3 M Investment.
• Second building molding floor shop layout design. Automated resin vacuum feed systems, Lean material flow and centralized chiller and heater processed water supply with capacity for 90 presses and 600 molds.
Molding Supervisor. 2007 to 2010
• In charge of Production schedule accomplishment, machine efficiency and cost monitoring for 40 presses from 50 to 600 tons. (over 85% efficiency)
• Responsible for process validations for molds and presses transferred or acquired to México.
• Coordinate mold efficiency improvement projects, (SMED, cycle time and scrap reduction)
• Responsible for mold preventive maintenance program, repairs and modifications.
• Participation in part and mold design review for new models
Molding Engineer 2005 to 2007
• Established standard procedures for mold qualification.
• Transferred equipment debugging, installation and qualification
• Cost reduction projects. Regrind reclaim closed loop operation.
• Production schedule monitoring software implementation.
• Implemented Molds Preventive Maintenance program (35% mold damage decrease)
• Glass filled nylon resins consolidation (62K)
TYCO HEALTHCARE KENMEX 2003 to 2005
Manufacturer of medical devices for surgical, urology, suction and vascular therapy under FDA and ISO regulations.
Molding-Manufacturing engineer
• Project leader for US Surgical mold transfer from North, Haven, CT to Tijuana facility. Lean manufacturing improvement by process consolidation for molding area. SMED system implementation. Setup improvement standardization for effective process control and monitoring. DOE to injection process to achieve dimensional targets. Resin changes and consolidation for cost reduction projects. Budget full cost revision update. Project leader for OEM products mold transfer. Kenmex project leader for new product implementation Gientri Port. Lay out design of assembly line (pneumatic press and drivers, UV gluing and ultrasonic welding and air leak testing)
• Clean room environment operation
• SMED Setup average time reduction (1 hr 40 min. to 45 min.)
• Mold deflashing campaign (eliminated rework. Savings $80K )
• PP Resin change and consolidation (savings $240K)
• Setup training program. Mold damage decreased in 40% (Improved tool room capacity)
AVERY DENNISON OFFICE PRODUCTS DE MEXICO. 2000 to 2003
New Tijuana manufacturing facility for Binders, sheet protectors and a wide variety of markers.
Molding Engineer
• Facility transferred from Crossville Tennessee to Tijuana México. Molding area start up , Molding machines installation, debugging and validation. Molds setups and procedures documentation to meet ISO 9000 regulations. Mold design and modifications experience. New products start up. Polypropylene and polystyrene processing. Hot Runners, floating plate molds, valve gated molds. Regrind closed loop implementation. Materials traceability system. Process monitoring DOE. Colorant suppliers certifying.
• Mold modification for marker’s cap seal (Savings $430K)
• Hot to cold redesign for marker’s body molds
• Markers cracking issue troubleshoot project(Savings $155K)
• Six Sigma Green Belt certification (60K)
BAXTER-ALLEGIANCE HEALTHCARE 1998 to 2000
Manufactures medical devices for Respiratory.
Jr. Molding Engineer
• Production crew supervision, Project Leader for transference projects to Allegiance Mexicali facility. Regulatory and manufacturing documentation under ISO and FDA regulations. Setup sheet development and process monitoring. Design Review on troubling molds. Validation protocols, Installation, operation and functional qualification for molds and molding machines. PM system for molds. Troubleshooting on Day to Day operation. Cycle time optimizing. Materials processed: Flexible PVC, Kraton, K-Resin, ABS, Polyethylene, Polypropylene in a clean room operation.
• Scrap reduction project in closed loop regrind operation.
• Material flow improvement layout modification.
• Packaging improvement project for oxygen and aerosol molded mask. (Savings $130K)
• Six Sigma Master black belt training SMSU
• Molding Equipment and Process validation
• Troubleshooting
• Industrial engineering costing pack