David Yamashita
Team Lead · Macy’s South Coast Plaza
Fountain Valley, CAIn My Own Words
*Experience with machine/carpentry tools, inventory control/organizing and maintaining BOM/parts list accuracy.
*Coordinated the ECN/RFI process, managed CAD standards and conducted site studies and project inspections.
*Provided direction to construction/manufacturing crews and maintained awareness of trends in energy efficiency.
*Working knowledge of Title 24/OSHPD/DSA/ADA/ASTM/ANSI/ASME/Fire Life Safety codes and LA plan check.
*Mitsubishi - Designed, coordinated and led in CA, HI, IL, NV & WA construction projects contracted up to $12M.
*Mitsubishi - Led the least amount of Design Team members in most yearly profitable US projects in 2003 - 05.
*Macy’s - Increased RFID inventory cycle count accuracy from 95%-99%, Increased monthly price change completion quota from 85%-90%, Increased order fulfillment completion accuracy to rank highest in all Macy’s stores nationwide.
Work Experience
Team Lead
Macy’s South Coast Plaza2013 – Present
*Lead and participate in all functions of pick/pack/ship for order fulfillment according to daily fluctuating demands. *Forecast trends affecting fulfillment operations and adjust personnel and shipment scheduling and area staging. *Utilize Macy’s inventory management system to process customer orders and track invoice and shipping data. *Initiate, maintain and compile records associated with the ordering, receiving and storing of all outbound orders. *Process returned orders which debit customer accounts, adjust inventory and restock items appropriately. *Perform quality checks of all documentation for outbound orders, ensuring proper labels/paperwork have been applied to orders, confirming total count of items are accurate and all packages meet shipping specifications. *Maintain current UPS/USPS shipping standards and reschedule variations in pick up timetables as necessary. *(RFID Associate 2013-14) Maintained RFID inventory accuracy, led monthly RFID team audits, investigated and reconciled cycle count differences and coordinated stocking area zone control for optimal space-saving efficiency.
Senior Drafter/Designer
Mitsubishi Electric USA, Inc., Elevator/Escalator Division1998 – 2007
*Evaluated architectural/structural building plans, contract specifications and work scope to advise on risk management for the design, layout and installation of new construction and retrofit elevator/escalator systems. *Planned, designed and coordinated the production of construction/installation documents utilizing AutoCAD (2D). *Led a design team in equipment selection and space allocation/alternative solution development to produce accurate layouts and detail drawings for equipment/system arrangement and structural attachment design. *Coordinated the RFI process/documentation, prepared design proposals and advised on space planning. *Analyzed physical space availability against actual space usage and advised on possible solutions and options. *Reviewed/processed drawings, calculations, plan checks and associated material prior to release, coordinated technical documentation work flow among internal/external clients and prioritized tasks and work loads of others. *Acted as primary point of contact to PM for technical inquiries and in resolving MEP/construction/design issues. *Led in-house facility CAD move projects and maintained layouts for in-house facility Fire/Life Safety team.
Graphic Designer
Professional Flyer Service1992 – 1998
*Designed/produced camera-ready artwork of drawings, graphs, maps, illustrations and type for advertisements and presentations. *Utilized computer and manual methods of graphic communication. *Assisted in customer advisement, technical design consulting and final product preparation/presentation.
Senior Engineering Technician
Elevator Research and Mfg., Corp.1987 – 1997
*Led lean/kaizen design/research/testing to improve and develop new elevator fixtures/components/controllers. *Utilized AutoCAD (2D) in a R&D/manufacturing facility to perform detailed mechanical/electromechanical studies. *Conducting root cause analysis and managed detailed BOM and prototype production data record accuracy. *Tested/submitted products for UL approval and coordinated the process/results for UL compliance requirements. *Increased communication/work flow efficiency as liaison between Engineering, Purchasing and Manufacturing. *Improved process/production efficiency by designing jigs/fixtures and redesigning shop floor and facility layouts. *Managed document organization/process/procedures and created/standardized a (ANSI Y14) CAD system.
Education
B.A.
California State University1988 – 1991
B.A.
A.S.
Don Bosco Technical Institute1983 – 1988
A.S.