ND

Ngoc Le Dang

Tech director · Dona Pacific Co., Ltd


Work Experience

Tech director

Dona Pacific Co., Ltd

2015 – Present

a member of Feng Tay Group, Taiwan • Responsibilities: ? Being top management in Technical Dep't ? Being in charge of all issues that occur in Dep't ? Taking care of daily operations and responsible for all performances and achievement in the Dep't ? Setting up schedules and plans for production, controlling lead-time, working-time and delivery time. ? Reporting directly to Tech VGM and up, Nike and HQ. ? Planning trial schedule for whole value stream map in the Tech team. ? Leadership on how to build, stitch, last with new model received from HQ. ? Preparations do the trial with Nike and HQ for all stages of project. ? Making Project file of each stage after trials to Nike and HQ ? Be communicating with Nike and HQ all of issues if project got the trouble and how to solve it. ? Working with production side and related dep't how to project going to mass production smoothly and get the RUT perfectly. ? Creating, Designing and setting jigs, tooling, process how to be improved the quantity and the quality in consistency from bottom to upper. ? MQA auditing and reporting to Nike and HQ weekly, monthly, quarterly ? Making the GTM samples sending to destination in the world. ? Following up the Nike regulation to do the trial, testing, opening new tooling, new project meeting ? Setting up Process Flow Chart issue to production side and keep tracking until done. ? Working with team to seek the method how to solve the issue on sample after trial with Nike & HQ. ? Building the finished shoe from 2D bottom drawing and plastic last. ? Checking the fitting unit sole and upper, outsole and Midsole.

• Position: Tooling Engineer • Company: The Representative Office Of Cole Haan Hong Kong Limited In HCMC, VN • Responsibilities:

? Checking 3D & 2D drawing BP from development stage ? Mold construction for production ? Sourcing bottom suppliers ? Confirmation bottom part with factory ? Working density of each kind of bottom part ? All the testing of bottom needs to be fixed ? Get involve from development stage to avoid potential mass production ? From 1st Proto sample -> 2nd proto sample -> Road lot sample -> Goby sample ? Tooling modification necessary development in case ? Inspected raw materials since arrival. ? Supporting & working with QA team to inspected finished shoes ? Potential such as: Bonding, migration color, production risk mentioned ? Fitting, Wearing & Physicals test result upgrade as well before goes to next round. ? Cost saving: sourcing working with supplier to deal the cost ? Working development team to change some concepts how to look nice shoe, good shape, combination color how to deal costing in great pricing but comfortable, flexible, moveable, workable ? Pay high attention to do trial new models, new patterns, new materials ? List out potential issue, given the solution, improvement to factory following up; keep tracking to upon be fixed. ? Auditing line by daily; Auditing mold shop, supplier by weekly or monthly ? Working closely with supplier to improve raw material quality, delivery on timetable. ? Working & suggesting with: Technical, Export, Quality factory's management to improved process & quality weekly. ? Get involve to new tooling & material from 1st proto until production as well. ? Controlling the cost under or equal CBD or TFOB from development stage ? Implementation process corrective ? Daily quality & shipment report to US team ? Oversea is necessary will be fine.

Developer

Tae Kwang Vina Co., Ltd

2006 – 2011

- Group leader, VT PCC • Company: Tae Kwang Vina Co., Ltd (T2 group) • Responsibilities: ? For DD and SPC project: ? Making sample shoes: receiving the Spec sheet (BOM) from BVTN developer ->Tearing down, meeting with Nike NLO, patterns samples team -> Checking color, material, pattern -> Ordering material -> Tracking and communicating with BVTN if something is unclear -> making comparison of material colors with CSI ->following the sample proceeding -> lasting process is available -> Inspecting -> shipping out sample to BVTN-> receiving feedback from Developer - > updating BOM ? Communicating directly to BVTN developer and NLO ? Suggesting Nike developers to change materials if FOB is higher than TFOB ? Suggesting BVTN to change something on samples if needed ? Controlling and following the lead time of samples as per requirements from Nike BVTN for each season and stage ? Recapping samples issues to Nike PE and CM after each stage as SAMM, RLF, GTM ? Being responsible for providing confirmed samples to production line ? Tracking stitching, assembling, material, unit part process. ? Double checking details of samples: color, material, 3D shape, craftsmanship standards, design standards ? Having high responsibility to Nike BVTN about the samples of each round ? Suggesting good ways/ideas to Nike BTVN on how to improve samples such as wrinkles, X-ray, bugle, colors, materials ? Auditing BOM to BVTN after finishing each stage ? Updating material situation and processing to PFC team

? For Commercialization project: ? Being in charge of Commercialized project from both SAMM stage to mass production and CLT ? Discussing and showing solutions to Nike and workshop side with abnormal cases ? Asking pattern team to revise or change patterns of incorrect one ? Attending trials and sending to Nike PE and HQ development recap for each round ? Improving working process and quality of trial samples

From 2011 to April 2015

Engineer

Dona Victor Mold MFG Co., Ltd

2002 – 2006

a member of Feng Tay Group, Taiwan • Responsibilities: ? Working on whole value stream map in Mold and tooling which is supporting to shoe making qualification. ? Details of jobs: CAD/CAM design -> CNC machine -> Casting/EDM -> Assembly -> QC -> Testing -> Adjusting -> QC -> Texture -> Plating/Coating/Teflon -> QC -> Delivery. ? How to control the working time as just in time as mentioned. ? Knowledge as well how to make the die cut ? Knowledge as well molds structure such as: IP, PU, RB, Phylon, CMP, H/F welding ? How to check the fitting between outsole & Midsole. ? How to check the thickness of bottom part fixed with 2D drawing/ 3D file standardize or not. ? Solving abnormal issue related mold quality, delivery ..